My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL INSTALL 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
6732
>
2300 - Underground Storage Tank Program
>
PR0231830
>
INSTALL INSTALL 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:05 PM
Creation date
11/7/2018 9:31:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
INSTALL 1987
RECORD_ID
PR0231830
PE
2361
FACILITY_ID
FA0004030
FACILITY_NAME
THREE PALMS GROCERY
STREET_NUMBER
6732
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10110001
CURRENT_STATUS
02
SITE_LOCATION
6732 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\6732\PR0231830\INSTALL 1987.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Overfill Protection System (spill catchment basins) required) <br /> A. Nonmotor vehicle fuels (See Option 1A) <br /> 1 . Level sensing device and N2 or N3 below <br /> 2. Audible/visual alarm triggered to liquid level sensor <br /> 3. Automatic shut-off device <br /> B. Motor vehicle fuels only <br /> 1 . Manual monitoring <br /> a. Written filling procedure provided <br /> b. Procedure addresses all of the following: <br /> 1 ) Visual monitoring of fuel level and filling operation <br /> 2) Available caacity of tank is at 103% or +200 gallons <br /> (2635- 9) (AM)(C)) <br /> 3) Metered input <br /> C. Spill catchment basin size <br /> 1 . Minimum 5 gallons <br /> 10. Secondary containers (Includes leak interception and detection systems). <br /> A. Backfill in secondary container -(_ Article 3, Section 2635) <br /> 1 . See Article 3 Section 2635(c) (1-8) . <br /> B. Two or more primary containers within secondary container (Demonstrate <br /> product compatibilities). <br /> C. Liquids detected in secondary containment must be sampled and analyzed for <br /> hazardous substances. (Article 3, Section 2635(6) and Health and Safety <br /> Code 25291 (e)(h) . <br /> D. Water tight cover for secondary container excavation (Article 3, Section <br /> 2635(1)) . <br /> 11 . Piping <br /> A4,q,Double containment required for: <br /> L'!1 . Product and vapor recovery lines. <br /> ✓2. Vent line (excluded only if ball float valve is installed) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.