My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL INSTALL 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
6732
>
2300 - Underground Storage Tank Program
>
PR0231830
>
INSTALL INSTALL 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:05 PM
Creation date
11/7/2018 9:31:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
INSTALL 1987
RECORD_ID
PR0231830
PE
2361
FACILITY_ID
FA0004030
FACILITY_NAME
THREE PALMS GROCERY
STREET_NUMBER
6732
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10110001
CURRENT_STATUS
02
SITE_LOCATION
6732 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\6732\PR0231830\INSTALL 1987.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPTION IA <br /> ARTICLE 3, SECTION 2631 <br /> MOTOR VEHICLE OR NONMOTOR VEHICLE FUEL TANK <br /> CONSTRUCTION STANDARDS <br /> /1 . Secondard containment provided. <br /> ___4./2- Primary containers shall be product tight. <br /> 3. Secondary containers <br /> A. Thickness, density, composition, and product compatibility. <br /> B. Sized to contain unauthorized releases for sufficient time to allow <br /> detection and removal . <br /> 4. Secondary container volumetric requirements <br /> A, Single primary container = 100%. <br /> B. Multiple primary containers = 150% of largest primary container or <br /> 10% above aggregate. <br /> 1 . Document interproduct compatibility <br /> 5. Secondary containers open to rainfall . <br /> A. Volumetric requirement = 24 hours of 25 year storm in addition to <br /> primary container volumes. <br /> 6. Pore space of granular material used as backfill for the primary containers. <br /> A. Refer to Section 2631 (g) . <br /> 7. Secondard container equipped with a collection system. <br /> A. Designed to: <br /> 1 . Accumulate <br /> 2. Temporarily store <br /> 3. Permit removal of: <br /> a. Precipitation <br /> b. Subsurface infiltration <br /> c. Released hazardous substances from primary container(s) . <br /> 8. Floor of Secondary container <br /> A. Constructed on firm base <br /> B. Sloped to collection sump ( 1/8" per foot) . <br /> 1 . One or more access casings installed in sump <br /> a. Sized to allow removal of collected liquid <br /> b. Extend to ground surface <br /> c. Perforated in sump region. <br /> d. Covered with a locked waterproof cap or within a secured facility <br /> e. Thick enough to withstand anticipated stresses <br /> f. Construction materials : <br /> 1 ) Are not weakened by stored product <br /> 2) Will not donate , capture, or mask constituents to be analyzed. <br /> ___9. Membrane liner specifications : <br /> A. Refer and comply with Article 3, Section 2631 j , k , 1 , and m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.