Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: <br /> ❑X Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the following checklist: <br /> ❑Yes ❑No* Hasall input wiring been inspected for proper entry and termination,including testing fur ground faults? <br /> ❑Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No* Was accuracy of system product level readings tested? <br /> ❑Yes ❑No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑No* Were all probes reinstalled properly? <br /> ❑Yes ❑No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑X Yes ❑Noy` For equipment start-up or annual equipment certification. was a leak simulated to verify LLD performance?(Check <br /> ❑N/A all that apply)Simulated leak rate: M3 g.p.h.; ❑0.1 g.p.h;❑0.2 g.p.h. <br /> ❑X Yes ❑No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑X Yes ❑ No* Was the testing apparatus properly cali brated? <br /> ❑Yes E]No* Formechanical LLDs,does the LL.D restrict product flow if it detects a leak? <br /> MN/A <br /> MYes ElNo* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> [:1N/A <br /> ❑X Yes [:]No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑N/A disconnected? <br /> 0 Yes ❑No* Forelectronic LLDs,does the turbine automatically shut off ifany portion of the monitoring system malfunctions or <br /> ❑N/A fails a test? <br /> Q Yes ❑No* For electronic IJ,Ds,have all accessible wiring connections been visual ly inspected? <br /> ❑N/A <br /> 0 Yes I [:]No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section FI,below,describe how and when these deficiencies were or will be corrected <br /> H. Comments: <br />