My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 15 - Painting <br /> SECTION 15 - PAINTING <br /> 15 . 0 This section describes the painting required for the work. <br /> 15 . 1 Related Documents : <br /> Drawings , general provisions of the Pacific Gas & Electric <br /> Company and Division-1 Specification Sections , apply to the <br /> work specified in this section . <br /> 15 . 2 Description of Work : <br /> 15 . 2 . 1 Extent of painting work is shown on drawings and <br /> schedules , and as herein specified . <br /> 15 . 2 . 2 The work includes painting and finishing of interior and <br /> exterior exposed items and surfaces throughout project , <br /> except as otherwise indicated . <br /> Surface preparation , priming , and coats of paint <br /> specified are in addition to shop priming and surface <br /> treatment specified under other sections of work. <br /> 15 . 2 . 3 The work includes field painting of exposed equipment <br /> installed under mechanical and electrical work except as <br /> otherwise indicated . <br /> "Paint" as used herein means all coating systems <br /> materials , including primers , emulsions , enamels , stains , <br /> sealers , and fillers , and other applied materials whether <br /> used as prime , intermediate or finish coats . <br /> 15 . 2 . 4 Paint exposed surfaces , except where natural finish of <br /> material is specifically noted as a surface not to be <br /> painted . Where items or surfaces are not specifically <br /> mentioned , paint same as adjacent similar materials or <br /> areas . If color or finish is not designated . Engineer <br /> will select these from standard colors available for <br /> materials systems specified . <br /> Following categories of work are not included as part of <br /> field-applied finish work , or are included in other <br /> sections of these specifications . <br /> 15 . 2 . 5 Shop Priming : Unless otherwise specified , shop priming <br /> of ferrous metal items is included under various sections <br /> for miscellaneous metals . <br /> KV-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.