My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Specification No . ; RGS0024-87 <br /> PART II - SPECIFIC CONDITIONS <br /> Section 5 - Submittals <br /> and not processed as shop drawings , product data , or <br /> samples . <br /> 5 . 3 General Submittal Requirements : <br /> 5 . 3 . 1 Coordination and Se uenc in_& Coordinate operation and <br /> processing of submittals with performance of the work so <br /> that work will not be delayed by submittals . Coordinate <br /> and sequence different categories of submittals for same <br /> work and for interfacing units of work so that one will <br /> not be delayed for coordination of Engineer ' s review with <br /> another . <br /> 5 . 3 . 2 Preparation of Submittals : Provide permanent marking on <br /> each submittal to identify project , date , Contractor , <br /> subcontractor , submittal name , and similar information to <br /> distinguish it from other submittals . Show Contractor ' s <br /> executed review and approval marking and provide space for <br /> Engineer ' s "Action" marking . Package each submittal <br /> appropriately for transmittal and handling . Submittals <br /> which are received from sources other than through <br /> Contractor ' s office will be returned by Engineer "without <br /> action" . <br /> 5 . 4 Specific Category Submittal Requirements : <br /> 5 . 4 . 1 General : Except as otherwise indicated in individual work <br /> sections , comply with requirements specified herein for <br /> each indicated category of submittal . Provide and process <br /> intermediate submittals , where required between initial <br /> and final , similar to initialsubmittals . <br /> 5 . 4. 2 Sho Drawin s : Provide newly prepared information on <br /> reproducible sheets with graphic information at accurate <br /> scale ( except as otherwise indicated ) with name of <br /> preparer indicated ( firm name ) . Show dimensions and note <br /> which are based on field measurements . Identify materials <br /> and products in the work shown. Indicate compliance with <br /> standards and special coordination requirements . Do not <br /> allow shop drawing copies without appropriate final <br /> "Action " markings by Architect /Engineer to be used in <br /> connection with the work . <br /> 5 . 4 . 3 Initial Submittal : One correctable translucent <br /> reproducible print and one blue line or black line print ; <br /> reproducible will be returned . <br /> V-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.