Laserfiche WebLink
0 <br /> Specification No . ; RGS0024-87 <br /> PART II - SPECIFIC CONDITIONS <br /> Section 5 - Submittals <br /> and not processed as shop drawings , product data , or <br /> samples . <br /> 5 . 3 General Submittal Requirements : <br /> 5 . 3 . 1 Coordination and Se uenc in_& Coordinate operation and <br /> processing of submittals with performance of the work so <br /> that work will not be delayed by submittals . Coordinate <br /> and sequence different categories of submittals for same <br /> work and for interfacing units of work so that one will <br /> not be delayed for coordination of Engineer ' s review with <br /> another . <br /> 5 . 3 . 2 Preparation of Submittals : Provide permanent marking on <br /> each submittal to identify project , date , Contractor , <br /> subcontractor , submittal name , and similar information to <br /> distinguish it from other submittals . Show Contractor ' s <br /> executed review and approval marking and provide space for <br /> Engineer ' s "Action" marking . Package each submittal <br /> appropriately for transmittal and handling . Submittals <br /> which are received from sources other than through <br /> Contractor ' s office will be returned by Engineer "without <br /> action" . <br /> 5 . 4 Specific Category Submittal Requirements : <br /> 5 . 4 . 1 General : Except as otherwise indicated in individual work <br /> sections , comply with requirements specified herein for <br /> each indicated category of submittal . Provide and process <br /> intermediate submittals , where required between initial <br /> and final , similar to initialsubmittals . <br /> 5 . 4. 2 Sho Drawin s : Provide newly prepared information on <br /> reproducible sheets with graphic information at accurate <br /> scale ( except as otherwise indicated ) with name of <br /> preparer indicated ( firm name ) . Show dimensions and note <br /> which are based on field measurements . Identify materials <br /> and products in the work shown. Indicate compliance with <br /> standards and special coordination requirements . Do not <br /> allow shop drawing copies without appropriate final <br /> "Action " markings by Architect /Engineer to be used in <br /> connection with the work . <br /> 5 . 4 . 3 Initial Submittal : One correctable translucent <br /> reproducible print and one blue line or black line print ; <br /> reproducible will be returned . <br /> V-2 <br />