My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No . : RGS0024-87 <br /> PART II - SPECIFIC CONDITIONS <br /> Section 5 - Submittals <br /> 5 . 4. 4 Final Submittal : Five prints ; two will be retained , and <br /> the remainder will be returned , one of which is to be <br /> marked up and maintained by Contractor as "Record <br /> Document" . <br /> 5 . 4 . 5 Product Data : Collect required data into one submittal <br /> for each unit of work or system and mark each copy to show <br /> which choices and options are applicable to project . <br /> Includes manufacturer ' s standard printed recommendations <br /> for application and use , compliance with standards , <br /> application of labels and seals , notation of field <br /> measurements which have been checked , and special <br /> coordination requirements . <br /> Maintain one set of product data ( for each submittal ) at <br /> project site available for reference by Engineer and <br /> others . <br /> 5 .4. 5 . 1 Submittals : Do not submit product data or allow its use <br /> on the project until compliance with requirements of <br /> contract documents has been confirmed by Contractor . <br /> Submittal is for information and record unless otherwise <br /> indicated . Initial submittal is final submittal unless <br /> returned promptly by Engineer , marked with an "Action" <br /> which indicated an observed noncompliance . Submit five <br /> copies ; two will be retained , and the remainder will be <br /> returned . <br /> Provide a preliminary single -copy submittal where <br /> required ( or desired by Contractor ) for selection of <br /> options by Engineer . <br /> 5 . 4 . 5 . 2 Installer ' s Copy : Do not proceed with installation of <br /> materials , products , or systems until final copy of <br /> applicable product data is in possession of Installer . <br /> 5 . 4. 6 Samples : If contractor is proposing a change in material , <br /> provide units identical with final condition of proposed <br /> materials or products for the work . Include " range " <br /> samples ( not less than three units ) where unavoidable <br /> variations must be expected and describe or identify <br /> variations between units of each set . Provide full set of <br /> optional samples where Engineer ' s selection is required . <br /> Prepare samples to match Architect ' s /Engineer ' s sample <br /> where so indicated . Include information with each sample <br /> v-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.