My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 6 - Temporary Facilities <br /> SECTION 6 - TEMPORARY FACILITIES <br /> 6 . 0 This section describes temporary facilities to be <br /> erected in connection with the work. <br /> 6 . 1 Related Documents : Project plans and general conditions of <br /> the Pacific Gas and Electric Company apply to work of this <br /> section. <br /> 6 . 2 Description of Requirements : <br /> 6 . 2 . 1 Definitions : Specific administrative and procedural <br /> minimum actions are specified in this section , as <br /> extensions of provisions in General Conditions and other <br /> contract documents . These requirements have been included <br /> for special purposes as indicated . Nothing in this <br /> section is intended to limit types and amounts of <br /> temporary work required , and no omission from this section <br /> will be recognized as an indication by Engineer that such <br /> temporary activity is not required for successful <br /> completion of the work and compliance with requirements of <br /> contract documents . Provisions of this section are <br /> applicable to , but not by way of limitation , utility <br /> services , construction facilities , security/ protection <br /> provisions , and support facilities . <br /> 6 . 3 Quality Assurance : <br /> 6 . 3 . 1 General : In addition to compliance with governing <br /> regulations and rules / recommendations of franchised <br /> utility companies , comply with specified requirements <br /> indicated and with applicable local industry standards for <br /> construction work ( published recommendations by local <br /> consensus "building councils" ) . <br /> 6 . 4 Job Conditions : <br /> 6 . 4. 1 General : Establish and initiate use of each temporary <br /> facility at time first reasonable required for proper <br /> performance of the work . Terminate use and remove <br /> facilities at earliest reasonable time when no longer <br /> needed or when permanent facilities have , with authorized <br /> use , replaced the need . <br /> 6 . 4 . 2 Conditions of Use : Install , operate , maintain , and <br /> protect temporary facilities in a manner and at locations <br /> which will be safe , nonhazardous , sanitary , and protective <br /> of persons and property and free of deleterious effects . <br /> VI-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.