My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No . : R.GS0024-87 <br /> Part 11 - SPECIFIC CONDITIONS <br /> Section 6 - Temporary Facilities <br /> 6 . 5 Temporary Utility Services : <br /> 6 . 5. 1 The types of services required include , but not by way of <br /> limitation , water , gas , sewerage , surface drainage , <br /> electrical power , and telephones . Where possible and <br /> reasonable , connect to existing franchised utilities for <br /> required services and comply with service companies ' <br /> recommendations on materials and methods or engage service <br /> companies to install services . Locate and relocate <br /> services ( as necessary ) to minimize interference with <br /> construction operations . <br /> 6 . 6 Temporary Construction Facilities : <br /> 6 . 6 . 1 The types of temporary construction facilities required <br /> include , but not by way of limitation , water distribution , <br /> drainage , dewatering equipment , enclosure of work, heat , <br /> ventilation , electrical power distribution , lighting , <br /> hoisting facilities , stairs , and ladders . Provide <br /> facilities reasonably required to perform construction <br /> operations properly and adequately . <br /> 6 . 7 Security/Protection Provisions : <br /> 6 . 7 . 1 The types of temporary security and protection provisions <br /> required include , but not by way of limitation , fire <br /> protection , barricades , warning signs , and site enclosure <br /> fence , building enclosure / lockup , environmental <br /> protection , and similar provisions intended to minimize <br /> property losses , personal injuries , and claims for damages <br /> at project site . <br /> At earliest reasonable date , enclosure project site or <br /> portion thereof determined by Contractor to be sufficient <br /> to contain entire construction activity . Provide 6 feet <br /> high chain-link steel fence . <br /> 6 . 7 . 2 Building Enclosure and Lock: At earliest possible date , <br /> secure site against unauthorized entrance at times when <br /> personnel are not working . <br /> V1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.