Laserfiche WebLink
Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 7 - Products and <br /> Substitutions <br /> from or confuse interpretation of requirements of <br /> contract documents . <br /> 7 . 6 . 8 Contractor ' s Procurement Obligations : Do not purchase <br /> subcontract for or allow others to purchase or <br /> subcontract for materials or units of work for project <br /> where a special project warranty , specified product <br /> warranty , certification , or similar commitment is <br /> required until it has been determined that entities <br /> required to countersign such commitments are willing to <br /> do so . <br /> 7 . 7 General Product Compliances : <br /> 7 . 7 . 1 General : The compliance requirements for individual <br /> products as indicated in contract documents are multiple <br /> in nature and may include generic , descriptive , <br /> propriety , performance , prescriptive , compliance with <br /> standards , compliance with codes , conformance with <br /> graphic details , and other similar forms and methods of <br /> indicating requirements , all of which must be complied <br /> with . Also " allowances " and similar provisions of <br /> contract documents will have a bearing on selection <br /> process . <br /> 7 . 7 . 2 Procedures for Selecting Products : Contractor ' s options <br /> selecting products are limited by contract document <br /> requirements and governing regulations and are not <br /> controlled by industry traditions or procedures <br /> experienced by Contractor on previous construction <br /> projects . <br /> 7 . 8 Substitutions : <br /> 7 . 8 . 1 Conditions : Contractor ' s request for substitution will <br /> be received and considered when extensive revisions to <br /> contract documents are not required and changes are in <br /> keeping with general intent of contract documents and <br /> when timely , fully documented and properly submitted . <br /> 7 . 8 . 2 Submittal of Request : Submit request for substitution in <br /> the form prescribed for "Product Data Submittals . " The <br /> burden of proof that the substitution is "equal" to that <br /> specified is the Contractor ' s responsibility . Include <br /> necessary technical data , test results , and compliance <br /> i VII-5 <br />