My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 8 - Project Closeout <br /> Submit certified copy of Engineer ' s final punch-list <br /> of itemized work to be completed or corrected , stating <br /> that each item has been completed or otherwise <br /> resolved for acceptance , endorsed , and dated by <br /> Engineer . <br /> - Submit consent of surety. <br /> Submit record liquidated damages settlement statement , <br /> acceptable to P .G . & E . <br /> Complete final cleaning up requirements , including <br /> touch-up painting of marred surfaces . <br /> - Revise and submit evidence of final , continuing <br /> insurance coverage complying with insurance <br /> requirements . <br /> 8 . 4. 2 Reinspection Procedure : Upon receipt of Contractor ' s <br /> notice that the work has been completed including <br /> punch- list items resulting from earlier inspections and <br /> excepting incomplete items delayed because of acceptable <br /> circumstances , Engineer will reinspect the work . Upon <br /> completion of reinspection , Engineer will either prepare <br /> certificate of final acceptance or advise contractor of <br /> work not completed or obligations not fulfilled as <br /> required for final acceptance . If necessary , procedure <br /> will be repeated . <br /> 8 . 5 Record Document Submittals : <br /> 8 . 5. 1 General : Specific requirements for record documents are <br /> indicated in individual sections of these specifications . <br /> Other requirements are indicated in General Conditions . <br /> General submittal requirements are indicated in <br /> " Submittals " sections . Do not use record documents for <br /> construction purposes ; protect from deterioration and <br /> loss in a secure , fire-resistive location ; provide access <br /> to record documents for Engineer ' s reference during <br /> normal working hours . <br /> 8 . 5 . 2 Record Drawings : Maintain a white print set (blue line <br /> or black line ) of contract drawings and shop drawings in <br /> clean , undamaged condition , with mark- up of actual <br /> installations which vary substantially from the work as <br /> ivlli-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.