My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
INSTALL_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:55:08 PM
Creation date
11/7/2018 10:18:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1987
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\W\WEST\4040\PR0231963\1987 INSTALL .PDF
QuestysFileName
1987 INSTALL
QuestysRecordDate
8/2/2018 9:19:50 PM
QuestysRecordID
3953873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specification No . : RGS0024-87 <br /> Part II - SPECIFIC CONDITIONS <br /> Section 9 -- Specific Conditions <br /> for Tank Installation <br /> tank from excavation and repeat the test procedure <br /> above-mentioned . If damage has occurred , tank shall be <br /> replaced , not repaired . <br /> Storage tanks shall be holiday tested prior to unloading <br /> at the project site . If the tank fails the holiday test , <br /> the tank shall be replaced with a new one . <br /> Storage tanks shall be tested with air pressure both <br /> before and after the tank is installed in the excavation. <br /> 9 . 9 . 3 Piping System : The entire piping system shall be <br /> disconnected from pumps and / or dispensers and tanks , and <br /> then be subjected to an air pressure test of 50 PSIG. The <br /> initial test pressure ( 50 PSIG ) should be maintained <br /> without pressure drop for 60 minutes before inspecting <br /> pipe joints , then leak tested with soap and water solution <br /> during pressure test . <br /> 9 . 9 . 4 A precision leak test shall be performed on the tank <br /> system using potable water as a medium . The water shall <br /> be removed by the Contractor only after the test indicates <br /> the system meets the state guidelines of 0 . 05 gallons of <br /> leakage per hour or less . Any repairs for a passing test <br /> shall be the Contractors responsibility , including retests . <br /> Only certified precision leak testors approved by P . G . &E . <br /> and San Joaquin Local Health District will be permitted to <br /> perform the tank testing . <br /> 9 . 10 Workmanshi2 : <br /> 9 . 10 . 1 Workmanship shall be of a standard generally accepted in <br /> the respective trade . Use only experienced , competent and <br /> properly equipped workmen . Replace work falling below <br /> this standard as directed by the Engineer . The Contractor <br /> shall supply all material , apparatus , instruments <br /> ( recently and accuratelycalibrated ) and labor required for <br /> carrying out these tests . The Contractor shall disconnect <br /> from the pressure tested system any equipment that can be <br /> damaged by the test pressure . Tanks and piping shall be <br /> cleaned and purged with compressed air before pressure <br /> tests . Tanks and piping under pressure shall not be left <br /> unattended . Tightening of a joint during pressure tests <br /> will be accepted . Any portion of the work which fails to <br /> operate properly shall be remedied by Contractor except <br /> IX-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.