Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> it ►Tankno/ogy <br /> TEST DATE: 12/30/98 8900 SHOAL CREEK,BUILDING 200 <br /> AUSTIN,TEXAS 78757(512)451-6334 WORK ORDER NUMBER: 2207028 <br /> CLIENT: CHEVRON, U.S.A. SITE: CHEVRON 200764 <br /> .., �•"u,.;ris_�y.,a u''�'a-';i.. .s4rmxir)I fil e nvx.a''i�.t. , TANK:INFORMATION <br /> Tank ID: 92 1 Tank manifolded: Bottom to top fill in inches: <br /> Product: SUPREME Vent manifolded: Bottom to grade in inches: <br /> Capacity in gallons: Vapor recovery manifolded: Fill pipe length in inches: <br /> Diameter in inches: Overfill protection: Fill pipe diameter in inches: <br /> Length in inches: Overspill protection: Stage I vapor recovery: DUAL <br /> Material: Installed: Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> TANKTESTRESULT�.ri`.'= _"_' ' "= ;�.E"ETECTOR�TESTsW <br /> .. ;,sP 8st'rMelhot1'{. v <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: <br /> Fluid volume in gallons: Model: <br /> Tank water level in inches: S/N: <br /> Test time: NOT Open time in sec: <br /> Number Of thermisters: TESTED Holding psi: NOT NOT <br /> Specific gravity: Resiliency cc: TESTED TESTED <br /> Water table depth in inches: est leak rate ml/m: <br /> Determined by(method): Metering psi: <br /> Leak rate in gph: Calib. leak in gph: <br /> Result: Results: <br /> COMMENTS COMMENTS <br /> UL ' GE <br /> Test time: Material: DN FZHERG w <br /> Ullage volume: Diameter(in): 2.0 <br /> Ullage pressure: Length (ft): 200.0 <br /> Results: Test psi: so <br /> Bleedback cc: 110 <br /> DATA FOR UTS4T ONLY: Test time (min): 30 <br /> Test 1:Start time: 23:os <br /> Time of test 1: Finish psi: so NOT NOT NOT <br /> Temperature: NOT Vol change cc: o TESTED TESTED TESTED <br /> Flow rate (cfh): TESTED Test 2: Start time: 23:15 <br /> Finish psi: so <br /> Time of test 2: Vol change cc: 0 <br /> Test 3:Start time: 23;25 <br /> Temperature: Finish psi: 50 <br /> Flow rate (cfh): Vol change cc: 0 <br /> Time of test 3: Final gph: 0.000 <br /> Temperature: Result: PASS <br /> Flow rate (cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 01/05/1999 11:52 MSHAW <br />