Laserfiche WebLink
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> P Tar*nology <br /> TEST DATE: 12/30/98 8900 SHOAL CREEK, BUILDING 200 <br /> AUSTIN,TEXAS 78757(512)451-6334 WORK ORDER NUMBER: 2207028 <br /> CLIENT: CHEVRON, U.S.A. SITE: CHEVRON 200764 <br /> dAL '22 :n-:... 4,te`��, iF.;;T'ANK'MF.ORMATION;;7' L` .+ . ..,2y t,g�u.,* v .:. 7111777777717 . <br /> Tank ID: 89 2 Tank manifolded: Bottom to top fill in inches: <br /> Product: PLUS Vent manifolded: Bottom to grade in inches: <br /> Capacity in gallons: Vapor recovery manifolded: Fill pipe length in inches: <br /> Diameter in inches: Overfill protection: Fill pipe diameter in inches: <br /> Length in inches: Overspill protection: Stage I vapor recovery: DUAL <br /> Material: Installed: Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> TANKTE47;#IESULT3'x' .;gst u1Bt11oc). ,T h :L,,; mTE RLES�.�APWVP igsl'rq.9ihftj& ( .t s�wi ° .a <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: <br /> Fluid volume in gallons: Model: <br /> Tank water level in inches: S/N: <br /> Test time: NOT Open time in sec: <br /> Number of Specitherfic <br /> g gravity: <br /> TESTED Holding psi: NOT NOT <br /> SpeCIfIC graVlty: Resiliency cc: TESTED TESTED <br /> Water table depth in inches: est leak rate ml/m: <br /> Determined by(method): Metering psi: <br /> Leak rate in gph: Calib. leak in gph: <br /> Result: Results: <br /> COMMENTS COMMENTS <br /> ULtJ1GETE5TESUL .eStO <br /> Test time: Material: Dw FxBERc <br /> Ullage volume: Diameter(in): 2.0 <br /> Ullage pressure: Length (ft): 200.0 <br /> Results: Test psi: 50 <br /> Bleedback cc: 140 <br /> DATA FOR UTS4T ONLY: Test time (min): 30 <br /> Test 1:Start time: 22:45 <br /> Time of lest 1: Finish psi: 50 NOT NOT NOT <br /> Temperature: NOT Vol change cc: e <br /> Test 2:Start time: 22:55 TESTED TESTED TESTED <br /> Flow rate (cfh): TESTED Finish psi: 5o <br /> Time of test 2: Vol change cc: 0 <br /> Test 3: Start time: 23:05 <br /> Temperature: Finish psi: 49 <br /> Flow rate (cfh): Vol change cc: 22 <br /> Time of test 3: Final gph: 0.006 <br /> Temperature: Result: PASS <br /> Flow rate (cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: FE PETRO <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 01/05/1999 11:52 MSHAW <br />