Laserfiche WebLink
11 • 001202 • <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN-PAGE 1 One form per facia <br /> R01. i <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION <br /> I. FACILITY INFORMATION <br /> 1. <br /> FACILITY ID# (Agency Use Only) <br /> 7. <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> II <br /> B SIN S 3 E D SS IOL BUSINESS SITE CITY la' <br /> LtY Lj r <br /> H. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releaser from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan(HMBP). <br /> D If safe to do an.facility personnel will take rmmediale measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> D Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the Local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> D Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer Intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste,will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br /> appropriately. <br /> D Facility personnel will determine whether any water removed from secondary containment systems,or from clean-up activity, has been in contact with soy <br /> bagedous material, If the water is contaminated,it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br /> §66262.11 finds that it is non-hazardous if the water has a petroleum sheen(Le.,rainbow colors),it is contaminated. A thick Beating petroleum layer may not <br /> necessarily display rainbow colors. Water(hazardous or non-bazardous)from sumps,spill containers,etc will mi be disposed to stone water systems. <br /> D We will review secondary containment systems for possible detenomtion If any of the following conditions occur, <br /> I Hazardous material in correct with secondary containment is not compatible with the material wed for secondary containment; <br /> 2. Secondary contamment Is prone to danmge from any equipment used m remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product1waste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> in. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permancndy on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,end after each use,supplies ere replenished as needed. Defective equipment is repaired or replaced as necessary <br /> EQUIPMENT NOT PERMANENTLY ONSITE BUT AVAILABLE FOR USE IT NEEDED: Cam Jere o i kable <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. Ria. WO. <br /> RI1. mi. <br /> RI2. R22 mi i <br /> R13. mi <br /> R0. Ra3. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: ansa <br /> NAME - + W. TITLE <br /> NAME Mi. TITLE <br /> NAME Raz TITLE %2 <br /> NAME R43. TITLE %3. <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE , —L BE MADE AS FOLLOWS: nso <br /> Ell.ADDITIONAL SYSTEM C , N YJ <br /> TESTING OR DATA COLLECTION A2. INSPECTIONBYQUALIFIEDPERSONS [13.RECALIBRATION OF HQUIPMENT <br /> ❑99.OTHER(SPaciBL):�r(,V J/vltlrc L ✓ F� DaO�, %L <br /> UN-022B-1/3 <br /> vvvrw.msldoesaB Rev.04102M <br />