My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
101
>
2300 - Underground Storage Tank Program
>
PR0231294
>
COMPLIANCE INFO 1987-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 4:18:13 PM
Creation date
11/7/2018 10:51:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2005
RECORD_ID
PR0231294
PE
2381
FACILITY_ID
FA0004037
FACILITY_NAME
TOP FILLING STATION
STREET_NUMBER
101
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15125306/07
CURRENT_STATUS
02
SITE_LOCATION
101 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WILSON\101\PR0231294\COMPLIANCE INFO 1987-2005.PDF
QuestysFileName
COMPLIANCE INFO 1987-2005
QuestysRecordDate
8/15/2017 4:19:14 PM
QuestysRecordID
3580991
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 February 1998 <br /> AGE-NC Project No. 95-0130 <br /> Page 3 of 7 <br /> LOCATION. JOB FUNCTION: LEVELS OF PROTECTION: <br /> Exclusion Zone Drill borings A B C D Other <br /> Reduction Zone Preserve samples A B C D Other <br /> and log borings <br /> Support Zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator(if necessary) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. No changes of the specified levels of protection <br /> shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Timothy J. Cuellar Coordinate tank removal activities. <br /> FIELD CREW: TASK: <br /> Equipment Operators Operation of heavy equipment. <br /> Soil Sam le Technician Collect soil samples. <br /> The works party(ies) were briefed on the content of this plan at the site on <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.