My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1048
>
2300 - Underground Storage Tank Program
>
PR0231462
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2019 8:09:02 AM
Creation date
11/7/2018 11:53:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231462
PE
2361
FACILITY_ID
FA0000508
FACILITY_NAME
7-ELEVEN INC #17647
STREET_NUMBER
1048
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21903003
CURRENT_STATUS
01
SITE_LOCATION
1048 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1048\PR0231462\COMPLIANCE INFO 2016 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
8/8/2016 6:25:14 PM
QuestysRecordID
3140675
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY <br />LINE TESTING !AUG 14 2018 <br />Test Method By: o Manufacturer <br />• Industry standard - Professional Engr _ Other (see below) <br />Test Method Uses: • Pressure <br />c vacuum Hydrostatic c Other (see below) <br />Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br />Description <br />Tank product <br />Pipe manufacturer <br />Pipe material <br />Primary pipe diameter (inches) <br />Secondary pipe diameter (inches) <br />Method of secondary pipe isolation <br />Location of secondary pipe isolation <br />Estimated length of piping run (feet) <br />(include length of branch runs) <br />Wait time for pressure to stabilize (hr:min) <br />Test start time <br />Initial pressure (psig) <br />Test end time <br />Final pressure (psig) <br />Test duration (hr:min) <br />Change in pressure (psig) <br />Pass/Fail threshold (psig) <br />TEST RESULT <br />Comments: <br />0 2017 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.