Laserfiche WebLink
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page 1 of 1 <br />Test Method Developed By: Piping Manufacturer Industry Standard r7j Professional Engineer <br />F— Other (Specify) <br />Test Method Used By: r Pressure Vacuum r! Hydrostatic <br />r Other (Specify) <br />Test Equipment Used: gauge Equipment Resolution: .20 <br />(Tank T-1 - RUL) STP <br />Containment 1 to 1/2, <br />3/4 <br />(Tank T-2 -PUL) STP <br />Containment 1 to 1/2, <br />3/4 <br />Piping Material: <br />dw flex <br />dw flex <br />Piping Manufacturer: <br />environ <br />environ <br />Piping Diameter: <br />2 in. <br />2 in. <br />in, <br />in. <br />Length of Piping Run: <br />90 ft. <br />90 ft <br />Product Stored: <br />RUL <br />PUL <br />Method and location of <br />piping -run isolation: <br />stp sump <br />stp sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />min <br />min <br />Test Start Time: <br />09:39:00 <br />09:39:00 <br />- <br />Initial Reading (Rl): <br />5.00000 PSI <br />5.00000 PSI <br />Test End Time: <br />10:39:00 <br />10:39:00 <br />Final Reading (RF): <br />5.00000 PSI <br />5.00000 PSI <br />Test Duration: <br />1 hr <br />1 hr <br />Change in Reading (RF -RI} <br />0.00000 PSI <br />0.00000 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />+/-0.00000 <br />+/-0.00000 <br />Test Result: <br />Pass <br />Pass <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />WO: 2332830 <br />