Laserfiche WebLink
S WRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page 1 of 1 <br />Test Method Developed By: F Tank Manufacturer Industry Standard r- Professional Engineer <br />F, Other (Specify) <br />Test Method Used By: F Pressure r"• Vacuum r Hydrostatic <br />r Other (Specify) <br />Test Equipment Used: VPLT Equipment Resolution: 0.00001 in. <br />STP Containment for <br />Tank T-1 RUL - I <br />STP Containment for <br />Tank T-2 PUL - I <br />Sump Diameter/Dimensions: <br />48 in. <br />48 in. <br />in. <br />in. <br />Sump Depth: <br />57.00 in. <br />57.00 in. <br />in. <br />in. <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />23.00 <br />23 00 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />21 00 <br />2100 <br />Condition of sump prior to testing: <br />good <br />good <br />Portion of Sump Tested' <br />28 <br />28 <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />r Yes r No f NA <br />r Yes r No r NA <br />r 1 es r NorNA <br />C Yes r No f NA <br />Turbine shutdown response time <br />02:00:00 sec <br />02:00:00 sec <br />sec <br />sec <br />Is system programmed for fail-safe <br />shutdown?* <br />r yes rNo r NA <br />r? Yes rNorNA <br />C Yes r Nor" NA <br />rYes r Nc rNA <br />Was fail-safe verged to be <br />operational?* <br />r Yes r Nor" NA <br />r Yes r No r" NA <br />r Yes rNo r NA <br />r Yes C Nor NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test <br />5 min <br />5 min <br />min <br />min <br />Test Start Time: <br />09:54:00 <br />10:09:00 <br />Initial Reading (Rt): <br />0.00000 in. <br />0.00000 is <br />Test End Time: <br />10:24:00 <br />10:39:00 <br />Final Reading (RF): <br />-0.00190 in. <br />-0.00160 in. <br />Test Duration: <br />30 min <br />30 min <br />Change in Reading (RF-Rl) : <br />-0.00190 in. <br />-0.00160 in. <br />Pass/Fail Threshold or Criteria: <br />+/-0.00200 <br />+/-0.00200 <br />+/_ <br />+/_ <br />Test Result: <br />Pass <br />Pass <br />Was sensor removed for testing? <br />r Yes r No r NA <br />r: Yes r" Nor NA <br />r Yes r No C NA <br />r Yes r No r NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />r yes r Nor NA <br />1 <br />IT Yes r" Nor NA <br />r Yes r Nor NA <br />r Yes r Nor NA <br />11 <br />COMMentS - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />NOV 3 <br />1vGrr..., <br />If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. <br />WO: 2332830 <br />