Laserfiche WebLink
S WRCB, January 2002 <br />7. UNDER -DISPENSER CONTA1N1%,FtvT aTnCl TECTYNf_ <br />Page 1 of 1 <br />Test Method Developed By: I— UDC Manufacturer r l Industry Standard r Professional Engineer <br />r O her S ect <br />Test Method Used By: r Pressure r Vacuum PF Hydrostatic <br />r Other S eci <br />Test Equipment Used: VPLT <br />Equipment Resolution: 0.00001 in. <br />UDC #1/2 <br />UDC #3/4 <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />environ <br />environ <br />UDC Material: <br />UDC Depth: <br />30.00 <br />30.00 <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />1000 <br />10.00 <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />1.00 <br />100 <br />Condition of UDC prior to <br />testing: <br />good <br />good <br />Portion of UDC Tested' <br />14 <br />14 <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />r Yes r Nor NA <br />IT Yes r Nor NA <br />f Yes r Nor NA <br />r 1 es r No f NA <br />Turbine shutdown response time <br />02:00:00 sec <br />02:00:00 sec <br />sec <br />sec <br />Is system programmed for fail- <br />safe shutdown?* <br />r; yes r Nor NA <br />r Yes P Nor NA <br />r Yes C Nor" NA <br />r Yes rNor NA <br />Was fail-safe verified to be <br />operational?* <br />r Yes r Nor NA <br />r Yes r Nor NA <br />r Yes r Nor NA <br />r Yes(- Nor NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />5 min <br />5 min <br />min <br />min <br />Test Start Time: <br />10:47:00 <br />10:47:00 <br />Initial Reading (RI): <br />0.00000 in. <br />0.00000 in. <br />Test End Time: <br />11:02:00 <br />11:02:00 <br />Final Reading (RF): <br />-0.00020 in. <br />0.00000 in. <br />Test Duration: <br />15 min <br />15 min <br />Change in Reading (RF -RI): <br />-0.00020 in. <br />0.00000 in. <br />Pass/Fail Threshold or Criteria: <br />+/-0.00200 <br />+/-0.00200 <br />+/- <br />+/_ <br />Test Result: <br />Pass <br />Pass <br />Was sensor removed for testing? <br />IT Yes r Nor NA <br />r Yes r Nor NA <br />r Yes r Nor NA <br />r Yes r Nor NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />r; Yes r No r NA <br />r Yes r Nor NA <br />r Yes r Nor NA <br />r Yes r Nor NA <br />Comments—(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br />o – <br />NOV <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to my ofthe questions indicated with an asterisk (*) is "NO" or "NA", the entire UDC must <br />be tested. <br />W0: 2332830 <br />