Laserfiche WebLink
*PflF1ED PROGRAM CONSOLIDATED FO .. <br /> UNDERGROUND STORAGE TANK <br /> t <br /> MONITORING PLAN — (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT(UDC) MONITORING ��"ka) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490.54 <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490 5,lb. <br /> LEAK MONITOR MANUFACTURER:VEEDER-ROOT 490.55. MODEL#:TLS-350 490-56 <br /> LEAK SENSOR MANUFACTURER:VEEDER-ROOT 490 57 MODEL#(S):208 490-56. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 4904i0- <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN: a.YES ❑ b.NO 49°'61_ <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a.YES ❑ b.NO 49OWU <br /> UDC CONSTRUCTION IS: ® 1.SINGLE WALL ❑ 2.DOUBLE WALL - 490'63_ <br /> IF DOUBLE WALL: 49md4a. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 49 "b. <br /> VII. PERIODIC SYSTEM TESTING <br /> 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490.65_ <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. v cck§2644.q <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49U66 <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49 7. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 49 <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ❑ h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties: 4m <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490.696 <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490 <br /> ID CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 4% 9d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49°.6x. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 49 <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:`UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490.699_ <br /> ❑ OTHER(Specify): 49 h <br /> 49 i. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490.70 <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact persons)for emergencies and monitoring alarms. <br /> IL COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 4 -71 <br /> FILL-TUBE SHUT-OFF VALVE SET AT 95% <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this plan.occurs 2.)all conditions that indicate a possible release are investigated;and 3.)all monitoring records are maintained properly. <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME NADEEM AHMED 490-72. TITLE:MANAGER 490'" <br /> NAME: ASIM AHMED 690.74- TITLE:MANAGER 49075. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I ceNify that the informatia pr"ed ed her ' and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE DATE: 490.T/. <br /> REPRESENTING. 1.T4N:Owier to 2.Faril. Owrcr/ nor❑ tborizd of Owner 490.76. 4/ <br /> APPLICANT NAME(print): 49 7e. APPLICANT TITLE: 490-79_ <br /> UPCF UST-D(122007)-3/4 www.uuidocs.org <br />