My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
BILLING 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:34:31 AM
Creation date
11/7/2018 12:01:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2012-2015
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\1434\PR0231465\BILLING 2012-2015.PDF
QuestysFileName
BILLING 2012-2015
QuestysRecordDate
6/26/2017 3:07:01 PM
QuestysRecordID
3465007
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 4904. <br /> PLAN TYPE ® 1.MONITORNG IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490.2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID 4(Agency Use Only) _ <br /> BUSINESS NAME(Same as Facility Name or DBA) Tower Mali# 886 <br /> BUSINESS SITE ADDRESS 1434 W Yosemite Ave. Ire CITY Manteca ,CA 95337 <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,pmventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> b ttheueq ipment manufacturers'instructions,or annually,whichever is mom fcequuent_Such work must be perforated byqualified personnel[23 CCR§2632,2634,X13 26411 <br /> MONITORING EQUIPMENT IS SERVICED Z 1.ANNUALLY [199.OTHER1 40.34. <br /> (SP�fY): 4903b. <br /> III. MONITORING LOCATIONS <br /> ❑ I.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN Z 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED In CCR§2632,26341 6964" <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that c" <br /> I.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490.5. <br /> WITH AUDIBLE AND VISUAL ALARMS.(23 CCR§2532.26341 <br /> SECONDARY CONTAINMENT IS: N a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49 ' <br /> PANEL MANUFACTURER: Veeder-Root 4902 MODEL#: TLS350 4968. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root 69x9" MODEL#(S):794390-420 490-10. <br /> -CF2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE W l. T NK( ).[23 CCR§2543] 490.1. <br /> PANEL MANUFACTURER: 490.12 MODEL#: 49613. <br /> IN-TANK PROBE MANUFACTURER: 49614, MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/MGHTLY ❑ c.WEEKLY 49616. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 40.17. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 018. <br /> 09 <br /> 490-19.9. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION[23 cm§2516.17 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 con§2 51 TESTING PERIOD: ❑ &.36 HOURS ❑ b.60 HOURS <br /> 490.22 <br /> ❑ 5.TANK INTEGRITY TESTING PER In CCR§2643.11 69623. <br /> 490-24. <br /> TEST FREQUENCY: ❑ a.ANNUALLY [Ib.BIENNIALLY E] c.OTHER(Specify): 49 25. <br /> TW-2y- <br /> C3 <br /> 8.26❑ 99.OTHER(Specify): 4937. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) i(iakeck' <br /> ® 1.CONTINUOUS MONITORING OF PIPE/P§PNG SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490'28. <br /> 123 cCR SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 090.29' <br /> §25361 <br /> PANEL MANUFACTURER:Vender-Root °90-30. MODEL#: TLS 350 49031. <br /> LEAK SENSOR MANUFACTURER: Veeder-Root °90.32. MODEL# 0794380-208 490.33. <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 49634. <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. R a.YES ❑ b.NO 40.x5. <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490.36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.In cm§25361 <br /> MLLD MANUFACTURER(S):FE Petro-STP-MLD VMI 437. MODEL#(S):Ve orless LD-2000 490'18' <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS.In ccR§26361 498.39. <br /> ELLD MANUFACTURER(S): 69006- MODEL#(S): 49041. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DE LECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 49043. <br /> ELLD FAILUREIDISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a YES ❑ It.NO 4968.4. <br /> ❑ 4.PIPE INTEGRITY TESTING. 49 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(SpeciTy) 490 77 .a <br /> ❑ S.VISUAL PIPE MONITORING. <br /> FREQUENCY: ® a.DAILY ❑ b.WEEKLY ❑ C.MEN.MONTHLY&EACH TIME SYSTEM OPERATED' 49049. <br /> •Allowed for modrorioX ofuoburie4 emvpencv xmvet9rfiwl vioeaooN M33aC§25261.5 )(3) _ <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.In cm§2636(5)(3)1 49050. <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.715 CONNECTED TO THE TANK SYSTEM. 49051. <br /> 49x51 <br /> ❑ 99.OTHER(Specify) 40.63. <br /> UPCF UST-D(126007)-1/4 3vww.un§docs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.