My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2300 - Underground Storage Tank Program
>
PR0231458
>
COMPLIANCE INFO 2013-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 4:47:19 PM
Creation date
11/7/2018 12:20:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2016
RECORD_ID
PR0231458
PE
2361
FACILITY_ID
FA0001196
FACILITY_NAME
SAVE ON FUEL
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
219-312-06
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\420\PR0231458\COMPLIANCE INFO 2013-2016.PDF
QuestysFileName
COMPLIANCE INFO 2013-2016
QuestysRecordDate
5/22/2018 4:08:03 PM
QuestysRecordID
3898484
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�HECEIVEL <br /> MAR 2 0 2015 <br /> SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING ENVIRONMENTAL <br /> Test Method Developed By: X Piping Manufacturer [I Industry Standard ro esstona Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure n Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> k _ Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Pipinand <br /> Run: Approx.80' Approx. 100' <br /> Product Stored: Regular 87 Super 91 <br /> Method d location of Test boot at STP Test boot at STP <br /> i mg-run isolation: Piping Sump#1 Piping Sump#2 <br /> Wait time between applying 15 Minutes 15 Minutes <br /> ressure and startin test: <br /> Test Start Time: 9:05 9:15 <br /> Initial Reading(R,): 3.5 Psi 3.5 Psi <br /> Test End Time: 10:05 10:15 <br /> Final Reading(RF): 3.5 Psi 3.5 Psi <br /> Test Duration: nNodetectable <br /> Eloss <br /> 1 Hour <br /> Change in Reading(RF-R,): 0 Psi <br /> Pass/Fail Threshold or No detectableloss <br /> Criteria:Test Result: Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.