My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2002 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2300 - Underground Storage Tank Program
>
PR0231458
>
BILLING 2002 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2023 3:41:09 PM
Creation date
11/7/2018 12:20:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2002 - 2012
RECORD_ID
PR0231458
PE
2361
FACILITY_ID
FA0001196
FACILITY_NAME
SAVE ON FUEL
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
219-312-06
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\420\PR0231458\BILLING 2002 - 2012.PDF
QuestysFileName
BILLING 2002 - 2012
QuestysRecordDate
5/22/2018 4:46:51 PM
QuestysRecordID
3898788
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JNIFIED PROGRAM CONSOLIDATED FORM ... <br /> UNDERGROUND STORAGE TANK - <br /> MONITORING PLAN-(Page l of 2) JIJA <br /> TYPE OF ACTION ❑1.NEW PLAN 12 2.CHANGE OF INFORMATION 6e 4WI <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. q/y�OF 490,2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) F UiI <br /> I. FACEUW INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) I , O� 3. <br /> BUSINESS SITE ADDRESS _ i l03_ CITY /r/9.V7 la <br /> IL EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)most be performed at the frequency <br /> specified by the equipment monufacturers'instrwions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR§2632,2634,2638,2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 4963a <br /> 49636 <br /> III.MONITORING LOCATIONS <br /> t,NEW SITE PLOT PLAN/MAP SUBMTTTED WITH THIS PLAN. [&2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)491 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 09 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 4965 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: 1Z a DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 49 <br /> PANEL MANUFACTURER: 0A71y,115C 490-7. MODAL#: 6 D 490'4 <br /> LEAK SENSOR MANUFACTURER: -TIG 496x. MODEL#(S): 49610 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(SL(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490'11 MODEL#: 49613 <br /> IN-TANK PROBE MANUFACTURER: 4914. MODEL#(S): 690-13 <br /> LEAK TEST FREQUENCY: ❑ &CONTINUOUS ❑ b.DAILYNIGHTLY ❑ c.WEEKLY °90'16 <br /> ❑ d.MONTHLY ❑ e.OTHER(S ify): 49617 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 9 <br /> 49631 <br /> 4961 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49620 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49621 <br /> 490.22 <br /> IS 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 49613 <br /> TEST FREQUENCY: ® a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <9 24 <br /> ❑99.OTHER (Specify): 49616 <br /> 49627 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUNT(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49024 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:iffliLDRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 490.29 <br /> PANEL MANUFACTURER: --e 49630 MODEL#: - .O 490.31 <br /> LEAK SENSOR MANUFACTURER: °90'33 MODEL#(S): .fr _ D tv� 49633 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,,URBINE)SHUTDOWN. ®a.YES ❑b.NO 490'34 <br /> FAI.UREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Pia.YES ❑b.NO 49635 <br /> Rg 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 49636 <br /> MLLD MANUFACTURER(S): - yla d o r I4=9 S 49637MODEL#(S): ' , t L 49631 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 49639 <br /> ELLD MANUFACTURER(S) 490.40. MODEL#(S): % _ .4 4911 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ i.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 4912 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a_y YES ❑b.NO 4913 <br /> ELLD FAI.URE/DISCONNECfION TRIGGERS AUTOMATIC PUMP SHUTDOWN. .YES ❑b.NO 490.10 <br /> 12 4.PIPE INTEGRITY TESTING 491s <br /> TEST FREQUENCY 19 a.ANNUALLY 0 b.EVERY 3 YEARS C.OTHERS if 490164917 <br /> 5.VISUAL PIPE MONITORING. 49 <br /> FREQUENCY P a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 4919 <br /> •Ano 6r mmibnn of mbvrid mi enerela fuel OMM aNy W NSC =L5 37 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(x)(3)1. 49650 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.715 CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> ❑ 99.OTHER(Specify) 49652 <br /> 49653 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.