Laserfiche WebLink
• "-UNIFIED PROGRAM CONSOLIDATED FORM <br /> .UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> I. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490548 <br /> 13 49a54b <br /> 1.CONTINUOUS ELECTRONIC MONITORING �2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRO*STAND-ALONE❑4.NO DISPENSERS ❑99.OTHERS i ): <br /> PANEL MANUFACTURER: 4sos5 MODELifpvy 49o-s6 <br /> LEAK SENSOR MANUFACTURER: 490'37MODELp490.58DETECTION OF A LEAK INTO THIP UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ES I b.NO 49°'59UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN S [�b.NO 49060. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a YES ❑b.NO 990.61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ® a YES ❑b.NO 49o.6z <br /> 2,UDC CONSTRUCTION IS (3l.SINGLE-WALLED ri 2.DOUBL -WALLED 49m <br /> IF DOUBLE WALLED: 49064e <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: [ILLIQUID 2.PRESSURE 3.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBL"4�8,UAL ALARMS ❑a.YES ❑b.NO 09p'64b <br /> VII.PERIODIC SYSTEM TES <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RCONTROL BOARD THAT ENHHANCED 49065. <br /> LEAK MIECTION(ELM MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EONTHS AS RE UIRED. 23 CCR 2644.1 <br /> IM 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49066 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490.67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/mI�aIintenance records are kept for this facility: <br /> Alarm logs 4so.68a w Visual Inspection Records 490.68b ©Tank integrity testing res <br /> SIR testing results(and supporting documentation records). 49 d ❑ Tank gauging results(andocumentation records). 4o <br /> ❑ATG Testing results(and supporting documentation records).40.687 ❑ Corrosion Protection 60- 0.688 <br /> Equipmem maintenance and calibration records. 4o6a <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 4x.694 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)40.696 <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49069c <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490694 <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 4906 <br /> STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490697 <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS`490.6% <br /> ❑ OTHER(Specify):M6914 6769; <br /> IB This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.4s0.7o <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments hereor indicate how many pages with additional information on specific monitoring procedures areattached;-flus pl. 49071 <br /> D u,f r'JI Al ��a/ <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ereuring that:I)the dailyhoutine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME ,S' C 4s0n TITLE S 490n <br /> NAME 4so.74 TITLE <br /> 49079 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is We and accurate to the best of my knowledge. <br /> APPLICANT SIGNA7 <br /> n/ 49076 DATE: Avon <br /> cP <br /> 0. Pcct:rrl'Iry O I T..t Ovm /na.. ❑2 F 'I' Own /0Sralor 0 �'/ //3 —C-/� <br /> APPLICANTyNAME(print): / 4978 APPLICANT TTI'LE: 490.79 <br /> UPCF UST-D(12!2007)3/4 <br />