My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2006 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2300 - Underground Storage Tank Program
>
PR0505151
>
BILLING 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2023 4:18:05 PM
Creation date
11/7/2018 12:22:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2006 - 2012
RECORD_ID
PR0505151
PE
2361
FACILITY_ID
FA0007815
FACILITY_NAME
QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\707\PR0505151\BILLING 2006 - 2012.PDF
QuestysFileName
BILLING 2006 - 2012
QuestysRecordDate
7/19/2016 3:38:44 PM
QuestysRecordID
3145622
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae I of 2) -.,•,� � `; o;:. • i, _ <br /> TYPE OF ACTION ❑I.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. a <br /> (Check oneitem only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) _ t <br /> BUSINESS NAME(Same as FACILITY NAME) /��f ; <br /> tQQ� Car a'.s('l 'v NVi>;i)tVN1::iv7A1. <br /> BUSINESS SITE ADDRESS '�O <br /> aj-� CITY <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 42632,2634 2638,2641) <br /> 0-9 3a <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490.36 <br /> II .MONIF NG LOCATIONS <br /> Ll/.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4904 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 00-5- <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: 5d a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 4906 <br /> PANEL MANUFACTURER: 490-7, MODEL#: 490'6 <br /> LEAK SENSOR MANUFACTURER: 490-9' MODEL#(S): 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR S GLE WALL TANK(S).(23 CCR 62643) 49x11 <br /> PANEL MANUFACTURER: - 49x12. MODEL#: 49°'13 <br /> IN-TANK PROBE MANUFACTURER: _ 090'14, MODEL#(S), _ 490.15 <br /> LEAK TEST FREQUENCY: ❑ CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ C.WEEKLY 490.16 <br /> tl.MONTHLY ❑ e.OTHER(Specify): 49x12 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. [Ib.0.2 g.p.h. [Ic.OTHER4eaiii <br /> (Specify): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49x20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49 21 <br /> 22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 424 <br /> 490-25 <br /> ❑99.OTHER (Specify): 49 M <br /> 490-27 <br /> V.PH'E MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that appy) <br /> 1.CONTINUOUS MONITORING OF PH'E/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND ,gaze <br /> VISUAL ALARMS. (23CCR§2636) ,�/ <br /> SECONDARY CONTAINMENT IS:tea.DRY ❑b.LIQUID FILLED ❑e.PRESSURIZED ❑d.UNDER VACUUM s 090.29 <br /> PANEL MANUFACTURER: d90.J0 MODEL#: • 39x31 <br /> LEAK SENSOR MANUFACTURER. °90.32 MODEL#(S): • 690.31 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ❑b.NO 49x34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECFED(23 CCR§2636)_ 490-36 <br /> MLLD MANUFACTURER(S): 490.37 MODEL#(S): 490-39 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490.39 <br /> ELLD MANUFACTURERS) d90.0°. MODEL#(S): 490,1 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ I.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 690'44 <br /> TEj 4.PIPE INTEGRITY TESTING 49x45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHERS i 490.4649047 <br /> ❑ 5.VISUAL PIPE MON RING. <br /> 490-48 <br /> FREQUENCY U14.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&.EACH TIME SYSTEM OPERATED' 49049 <br /> 'Albxed far moi - of WDuried mvaar fuel HSC§252815 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA]23 CCR§2636(a)(3)]• 49050 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 4905z <br /> a9LL53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.