Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUNDSTORAGETANK <br /> MONITORINGPLAN (Page2of2) <br /> VL UNDER DISPENSER CONTAINMENT(UDC)MONITORING _ <br /> L UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490.511 <br /> L CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 49 Mb <br /> ❑4.NO DISPENSERS_❑99.OTHER(Specify): <br /> PANEL MANUFACTURER: 49o-ss MODEL M' 490. <br /> LEAK SENSOR MANUFACTURER: 490.57 MODEL M(S): 490'511 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS a.YES ❑b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN a.YES ❑b.NO 490°0 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. * a.YES ❑b.NO °goat <br /> UDC MONITORING STOPI THE FLOW OF PRODUCT AT THE DISPENSER. a.YES ❑b.NO 490112 <br /> 2.UDC CONSTRUCTION I3 1.SINGLE-WALLED Q.DOUBLE-WALLED 49063 <br /> IF DOUBLE WALLED: . r. 49 <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: 1.LIQUID ❑2.PRESSURE ❑3 VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 49P69b <br /> VIL PERIODIC SYSTEM TESTING <br /> I. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49aa5. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR 2644.1 <br /> .SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490115 <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. ' <br /> VIIL RECORDKEEPING <br /> The following monhoring/ma [mance records are kept for this facility: <br /> Alamt logs 49aa11e Visual Inspection Records 4W611b I Tank integrity testing results 490a11c <br /> ❑SIR testing results(an supporting documentation records). 490 ❑ Tank gauging results(and supporting documentation records). 49011114 <br /> ❑ATG Testing results(and supporting documentation records).490a8f ❑ Corrosion Protection 60-day logs 49oasg <br /> ❑Equipment maintenance and calibration records. 49aaeb <br /> III.TRAE9NG <br /> ❑Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 4904% <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ❑ THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49o.49b <br /> �p ❑ OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)49oax <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49 % <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490 <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-W <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49M98 <br /> ❑ OTHER(Specify):raMaisa <br /> ❑This facility has a"Designated UST OpemtoP who has passed the California UST System Y Operator f the administered by the[,and within <br /> Code sof hire. <br /> (ICC). <br /> The training <br /> will incl UST Operator-i will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of htre.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employce's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.e9( 'W <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how ges with additional infom tion m specific monitoring procedures are atmchod to this plan.490.71 <br /> jlvd-ha w f Cs�T /ae '1 7U'76 <br /> XL PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The followin,=person(S)are responsible for performinfP[he monitoring and equipment maintenance. <br /> NAME /tl..� �-v,b 490-n TITLE 49o-n <br /> NAME 1190-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of The facility, provide a report to the owner/operator,and inform the owner/operator of tory <br /> conditions that need follow-up action. <br /> XD.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify dust the info Wed <br /> APPLICANT SIGNATUZREherein is hue and accurate to the beat of my knowledge. <br /> APPLICANT SIGNATURE 490-96 DATE: 49on <br /> r ID � ZO / l <br /> I.Turk in 2 Fecili relw 3.Au f <br /> APPLICANT NAME(print): 490115 <br /> APPLIC TITLE: 49o-n <br /> UPCF UST-D(1242007)3/4 <br />