Laserfiche WebLink
SWRCB,January 2002 <br /> • • Page 3—of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: rpmg Manufacturer U Industry Standard U Professional Engineer <br /> 'U Other(Sp eclfy) <br /> Test Method Used: `essure U Vacuum U Hydrostatic <br /> 'U Other( edify) <br /> Test Equipment s %✓' P s 7— Equipment Resolution: ' to—t 5 P,s= <br /> TP'ipinnZR=aa P[ping Hun# Z Piping Run# Piping Run# <br /> Pip' Materiel F;4.. 1 ds s f tlo.� b�.sipingMa�Cturer. ur,Piping Diameter, It <br /> 3 <br /> Length of Piping Run YO R, l`fa ✓oy. i IV 6pz?Yy)e 13Ot <br /> Product Stored: 2 c R ce,✓ At g SK <br /> Method and location of -es4 bout- al T�6-4- bad3–u Tc 4--b�a�–ud <br /> run isolation: 7 1 5 T P 2, 3 TP 3 <br /> WE4,MWO04twemapplying <br /> um/water and <br /> sErtin test: v t ko u <br /> Test Start Time: 8 3 d <br /> Initial Reading(114): PS= S P S.t 6 R S.S <br /> Test End Time: 'J C� <br /> Final Reading(Rr)= <br /> Test Duration: l ou✓ )-I otter l u <br /> Champ inReading(Rr-RJ: 4pSZ rg'= 5=-- <br /> P&%VFaD Tbresholt}or <br /> Criteria: ljo Loss T-v ris= /,)U IAS$ z�pX "65 n^ h s <br /> COmmenb–(Lrclude informption on repairs made prior m terrLrg and reaommended1allots�up forjaJled rens). <br />