Laserfiche WebLink
SWRCB,January 2002 • • Page__±of g <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard _,' rofessional Engineer <br /> 0 Other(Spec(fy) <br /> Test Method Used: 0 Pressure 0 Vacuum Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: Cg t jl we l l )_, 4,t 1. Equipment Resolution: �afl 5 <br /> Sump# Sump# Sump# Sump# <br /> Sump Diameter: 41" <br /> Sump Depth: U or' Q 3 <br /> Sump Material: V1 L4 5 <br /> Height from Tank Top to Top of n <br /> Highest Piping Penetration: I 1( <br /> Height from Tank Top to Lowest rl <br /> to r <br /> Electrical Penetration: 10 <br /> Condition of sump prior to testing: `l>Yl D✓ D✓ <br /> Portion of Sump Tested' W a4�r Le�Zt- 1,3" W.,4' ' Lpn�et- e <br /> Does turbine shut down when <br /> sump sensor detects liquid(both %K?es 0 No 0 NA �Yfes 0 No 0 NA Yes 0 No DNA 0 Yes No DNA <br /> product and water)?� ✓\ <br /> Turbine shutdown response time It Z Sic-. <br /> Is system programmed for fail-safe es 0 No DNA es 0 No DNA tes 0 No DNA 0 Yes No DNA <br /> shutdown? <br /> Was fail-safe verified to be ,)'es 0 No DNA KOS 0 No DNA es 0 No DNA 0 Yes IONo DNA <br /> operational?' <br /> Wait time between g <br /> pressure/vacu ate d starting <br /> test: to r-1 r r, 10 PA z KV4:I-S <br /> Test Start Time: 8 ,.-50 <br /> Initial ReadingVFV-4Prvi;uvcl0 �5r51-Gtval2 <br /> Test End Time: 9 '• o D I :q5 <br /> Final Reading(RF): f-rvb 4 Lar k{, 1=1rw+C.n c -e rr st <br /> Test Duration: 3D M w" 5 3 p in mv-as 36 M i nw {S <br /> Change in Reading(RE-R1): N ams+µ N u u <br /> Pass/Fail Threshold or Criteria: a a 5 /3 o m* o o a hi :., ,o o S3s br:r <br /> Test Result: Sk.Pass 0 Fail Pass 0 Fail pe Pass 0 Fail Pass 0 Fall <br /> Was sensor removed for testing? es 0 No DNA T0 No 0 NA es 0 No DNA Yes ONO 0 NA <br /> Was sensor properly replaced and J<Yes 0 No DNA X'es 0 No DNA- <br /> XeS (-]No 0 NA Yes 0 No 0 NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />