My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
824
>
2300 - Underground Storage Tank Program
>
PR0231459
>
COMPLIANCE INFO 2013 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 2:02:53 PM
Creation date
11/7/2018 12:28:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2015
RECORD_ID
PR0231459
PE
2361
FACILITY_ID
FA0003677
FACILITY_NAME
DIAMOND GAS AND FOOD MART
STREET_NUMBER
824
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22118003
CURRENT_STATUS
01
SITE_LOCATION
824 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\Y\YOSEMITE\824\PR0231459\COMPLIANCE INFO 2013 - 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2013 - 2015
QuestysRecordDate
2/21/2017 6:51:40 PM
QuestysRecordID
3341688
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 • Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: D Piping Manufacturer ®Industry Standard D Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: ®Pressure D Vacuum D Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run Y Piping Run# Piping Run# <br /> REGULAR PLUS PREMIUMPiPins Run <br /> Piping Material: FIBER FIBER <br /> Piping Manufacturer: ANIERON AMERON <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 150ft 150ft <br /> Product Stored: GASOLINE GASOLINE <br /> Method and location of SUMP/BOOT SUMP/BOOT <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 1030 1030 <br /> Initial Reading(R): 3 psi 3psi <br /> Test End Time: 1130 1130 <br /> Final Reading(RF): 3 PSI 3 PSI <br /> Test Duration: lHR IHR <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fall Threshold or 0 0 <br /> Criteria: <br /> Test Result: X Pass D Fail X Pass D Fail Pass D Fail D Pass D Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> CII Ir-r, <br /> �;g �a� <br />
The URL can be used to link to this page
Your browser does not support the video tag.