My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987-2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2300 - Underground Storage Tank Program
>
PR0231282
>
COMPLIANCE INFO 1987-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:33 PM
Creation date
11/7/2018 12:36:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2013
RECORD_ID
PR0231282
PE
2381
FACILITY_ID
FA0003909
FACILITY_NAME
PORT OF STOCKTON
STREET_NUMBER
2201
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503001
CURRENT_STATUS
02
SITE_LOCATION
2201 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\W\WASHINGTON\2201\PR0231282\COMPLIANCE INFO 1987-2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* USTMAN SIR SYSTEM <br /> Monthly Monitoring Report <br /> DECEMBER, 1993 <br /> Report Date: 01/19/94 <br /> Company name :PORT OF STOCKTON <br /> Station Name: STOCKTON PORT DIST. Station # SPD <br /> Address: 2201 W. WASHINGTON City: STOCKTON State: CA <br /> PART A: <br /> -- - - - - - - - - <br /> _ __ -_ _ _ - _ - - -- Data <br /> Tank ID: Tank and Lines Status: Product: Quality: Dels: Sales: <br /> 2503 TIGHT DIESEL GOOD 0 417 <br /> 2502 TIGHT UNLEADED GAS FAIR 8789 5250 <br /> USTMAN INDUSTRIES INC. is a certified Statistical Inventory Reconciliation <br /> (SIR) release detection vendor. Tank status results for monthly monitoring <br /> are based on parameters specified by the EPA protocol for SIR methods. <br /> PART B. Comments and Recommendations <br /> O/S listed below represent removals, additions or delivery discrepancies <br /> which were accounted for as part of the SIR analysis. <br /> 2501 82/7/1993 : -126) <br /> 2502 f12/711993:DEL -271) {12/15/1993 : 200) {12127/1993: 108) <br /> (.12/28/1993 : 110) <br /> For regulatory compliance in California, a piping integrity test <br /> every 12 months and a tank integrity test every 24 months are <br /> required in association with SIR monthly monitoring. <br />
The URL can be used to link to this page
Your browser does not support the video tag.