Laserfiche WebLink
(3) Grading and drainage plans (5 copies) . <br /> (4) Plans. for all necessary utility lane extensions . (5 <br /> copies) . <br /> (5) A comprehensive site-specific geology and soils report <br /> in degree of detail commensurate with the nature of the <br /> project as required. <br /> b. if yes, attach complete project description and plans for <br /> entire project. <br /> 5. a. Estimated project cost: $ 3,000,000.00 <br /> b. Estimated construction time: 4 months <br /> 6. Project Site: <br /> a. Lot Area 187,200 sq.ft. (sq. ft/acres) <br /> b. Total Coverage of Paved Areas 31,584 sq.ft. (sq. ft/acres) <br /> C. Existing Grade 6.50-, ft. elevation (ft. ) <br /> d. Average Finished Grade 6.50 ft. elevation (ft. ) <br /> e. Buildings: <br /> Gross Floor No. of Height of Employee <br /> Area (sq. ft. ) Floors Building Capacity <br /> Existing N/A N/A N/A N/A <br /> Proposed 120,000 sq.ft. 1 40 ft. 25 -- 50 <br /> f. Number of Parking spaces (covered/open) : NONE ADDITAONAL <br /> g. Landscaped and unimproved area NONE (sq. <br /> ft/acres) <br /> 7. Describe current location of service lines for necessary utility <br /> connections and any necessary extensions or relocations of service <br /> lines. <br /> SEE ATTACHED PLAT <br /> 8. Describe any feasible alternatives or any feasible mitigation <br /> measures available which would substantially lessen any <br /> significant adverse impact which the development may have on the <br /> environment. <br /> THERE ARE NO-ADVERSE IMPACTS. <br /> 24/1051: 02 /3/ <br />