Laserfiche WebLink
8 a. Describe the method that will be utilized to purge andlorinert the tank(s): <br /> b. TankMplug Hauler-, <br /> Name Not Applicable — Tank to be abandoned in — place <br /> Address City yip <br /> Phone No.(__�_ <br /> Hauler Registration#(1f hauled as hazardous) <br /> c. Tank/Piping Disposal Site: <br /> Name Not Applicable — Tank to be abandoned in place , <br /> Address Clty zip- <br /> Phone No.( J <br /> EPA ID#(if transported to a permitted TO facility) <br /> 9. Is the sampling Hrm an independent third party from the contractor? YES[J No[J <br /> i <br /> 9a. Describe,to detaD,how the soli andlor water sample(s)beneath the tank and piping will be obtained: <br /> Refer to Erl r F Kali k' 7 T h I n l <br /> 1 tt c r hdate <br /> I — <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> Not Applicable — Tank to be abandoned in — place <br /> I <br /> I1. Handling of excavated soil: <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> Nva <br /> b)What will be the final destination of the excavated stockpile? <br /> c)Contaminated Sail Hazardous Waste Hauler- <br /> Name. <br /> aulerName. N/A HaulerReglstratlon! <br /> Address City <br /> Phone No.( ) <br /> EH 23 046(Revised 08/13199) Page 5 <br />