Laserfiche WebLink
General Requirements <br /> 1 of 8 <br /> GENERAL REQUIREMENTS <br /> SECTION 01010 <br /> PART 1 - GENERAL <br /> 1.01 EXTENT OF WORK <br /> A. General: This Specification covers work to repair leaks in underground diesel fuel piping <br /> at PG&E's Stockton Service Center. Work to be performed by Contractor shall comply with the <br /> requirements of the Specific and General Conditions of this Specification and other documents <br /> specified under Contents.. The Specific and General Conditions are complementary and are <br /> intended to be consistent with each other. Contractor's Work shall include furnishing labor, <br /> materials, tools, equipment, and facilities required therefore. Work necessary to make a <br /> complete installation ready for use or operation in accordance with the terms of Contract, shall <br /> be performed and considered as included in the prices quoted for Work whether or not <br /> specifically classified for payment. <br /> B. Location: The project is located at 4040 West Lane, Stockton, CA, at the fuel island. <br /> C. Definitions: Definition of PG&E, Contract, Contractor, Specification, Work, etc., is as <br /> defined under the General Conditions of this Specification. <br /> D. Conflicts: <br /> 1. Should a conflict exist between the General Conditions and the Specific Conditions, <br /> the Specific Conditions shall control. Should a conflict exist between the Specific <br /> Conditions or General Conditions and the Appendices, the Specific Condition or <br /> General Conditions shall control. Should a conflict exist between the Specification and <br /> applicable federal, state, or local law, rule, regulation, order or code shall control. <br /> Varying degrees of stringency among the General Conditions, Specific Conditions, <br /> Appendices, laws, rules, regulations, order or codes are not deemed conflicts and the <br /> most stringent requirement shall control. <br /> 2. Contractor shall immediately notify PG&E of any conflicts as described in Paragraph <br /> 15 of the General Conditions. <br /> E. Schedule: The schedule shall be mutually established between Contractor and PG&E <br /> after award of Contract. <br /> 1. All work performed under this specification shall only be undertaken by a Contractor that <br /> shall fully comply with all applicable provisions of law, including, but not limited to local, <br /> state and federal statutes, regulations and orders. <br />