My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_1998 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:01:47 PM
Creation date
11/7/2018 12:49:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2001
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\IAError\W\WEST\4040\PR0231963\COMPLIANCE INFO 1998 - 2001 .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Requirements <br /> 7 of 8 <br /> B. All persons shall wear hard hats while at the work site. Hats shall all be distinguishable <br /> from those worn by PG&E and other Contractor personnel on the work site. <br /> C. Records: <br /> 1. Contractor shall have and maintain an up-to-date list of its employees' names and <br /> addresses. <br /> 2. Contractor shall immediately notify PG&E of any medical emergency while on <br /> PG&E property and shall provide a written report to PG&E within 24 hours. <br /> 1.06 CONSTRUCTION SCHEDULE <br /> A. Contractor's Schedule: Submit a detailed bar chart schedule showing all the Work <br /> prior to commencing work. Show the key activity completion dates. <br /> 1.07 SUBMITTALS <br /> A. General <br /> 1. Submittals are instruments of Contractor and defined herein to include product <br /> data. <br /> a. Product Data: Illustrations, standard schedules, performance charts, instruction, brochures, <br /> diagrams, and the information furnished by Contractor from the manufacturer to illustrate a <br /> material, product, or system for some portion of the Work. Le. - concrete mix design(s) and <br /> concrete adhesive(s) data. <br /> 1.08 FINAL ACCEPTANCE <br /> A. General: PG&E will develop a punch list of Work to be performed that must be fulfilled by <br /> Contractor prior to final acceptance of the project by PG&E and issuance of a Final <br /> Certificate of Payment. <br /> B. Final Cleanup: Immediately prior to Contractor's request for final inspection of the Work <br /> or any portion thereof, final cleanup shall be performed by Contractor. In addition to the <br /> normal "broom-clean" requirements, Contractor is responsible for assuring that the <br /> exposed surfaces of the following materials shall be cleaned as listed herein: <br /> 1. Concrete Slabs: Scrape and remove all concrete and adhesive residue from <br /> adjacent surfaces. <br /> 2. Premises and Site: Remove all trash, debris, and excavation concrete and dirt. <br /> No items shall be left or discarded elsewhere on the site. Items that shall be <br /> discarded shall be removed to authorized public dumps. Leave premises "broom- <br /> clean." <br />
The URL can be used to link to this page
Your browser does not support the video tag.