My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_1998 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 3:01:47 PM
Creation date
11/7/2018 12:49:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998 - 2001
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\IAError\W\WEST\4040\PR0231963\COMPLIANCE INFO 1998 - 2001 .PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST Monitoring Plan • • <br /> Stockton Service Center <br /> • <br /> INTRODUCTION <br /> The Stockton Division presently has approximately nine (9) underground storage tanks in use within its service <br /> area. This document outlines methods and procedures for the continuous monitoring of the structural integrity of <br /> the tanks and related piping systems, and for leak response requirements. The information contained herein was <br /> compiled as guide to the administration of the program pertaining to the underground storage tanks located at <br /> Stockton Service Center. <br /> The Environmental Affairs Department implemented several years ago an aggressive, on-going, program for the <br /> identification, removal, closure, and/or replacement of underground storage tanks that no longer meet strict <br /> groundwater protection standards. This plan is intended to lead local administrators and other responsible <br /> employees in the continuous monitoring of existing tanks so that the tanks will maintain an environmentally safe <br /> and healthy workplace for all employees. <br /> Questions regarding the information contained in this booklet should be directed to the Division Environmental <br /> Specialist, Dave Germann, who can be reached at company telephone extension 8/842-1566. <br /> • <br /> • <br /> UST Monitonng Plant.do <br />
The URL can be used to link to this page
Your browser does not support the video tag.