My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:33:41 AM
Creation date
11/7/2018 3:42:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\2650\PR0232573\COMPLIANCE INFO 1992-2014.PDF
QuestysFileName
COMPLIANCE INFO 1992-2014
QuestysRecordDate
8/2/2017 3:55:42 PM
QuestysRecordID
3544390
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Results of Testing/Servidle <br /> 1 <br /> aftware Version Installed: <br /> Complete the foiloAing checklist: <br /> Y LlNo* Is the audible alarm operational? <br /> ❑ No* Is the visual alarm operational? <br /> Y ❑ No* Were all sensors visually inspected,functionally tested, and confirmed�rationn ? <br /> ❑ Yes L-; iso" i were aii sensors installed at lowest point of secondary containment and positioned so that ether equipment will <br /> not interfere vridt their proper o cration? <br /> ❑ Yes ❑ T If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> LYIN/A operational? - <br /> Ll Yes ❑ >a,*— For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ZrNIA monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) ❑Surnp/Trench Sensors; ❑ Dispen..er Contaituncnt Sensors. <br /> Dad you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑Yes; ❑ No. <br /> ❑ Yes 13 Ne For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> 23"N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> "fill point(s)and o rating properly? If so, at what percent of tank ca acity does the alarm trigger? % <br /> Yes* No Was any monitoring equipment replaced? If yes, identify specific sensors, probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ❑ Yes* o Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br /> Product; ❑Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoringsystem set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes C] No* Is all monitoring e uipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> 4 ^ <br /> Page 2 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.