My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
2650
>
2300 - Underground Storage Tank Program
>
PR0232573
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 11:33:41 AM
Creation date
11/7/2018 3:42:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0232573
PE
2361
FACILITY_ID
FA0003941
FACILITY_NAME
ORCHARD SUPPLY HARDWARE #1570
STREET_NUMBER
2650
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21307061
CURRENT_STATUS
02
SITE_LOCATION
2650 MACARTHUR DR STE A
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MACARTHUR\2650\PR0232573\COMPLIANCE INFO 1992-2014.PDF
QuestysFileName
COMPLIANCE INFO 1992-2014
QuestysRecordDate
8/2/2017 3:55:42 PM
QuestysRecordID
3544390
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In-Tank Gauging I SIR Equipment: ❑ C �k this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perfomi leak detection monitoring. <br /> Complete the following checldist: <br /> JF_U Yes . ❑ No* Has 0 input wiring been inspected forz,rooerentry and rl-7miration. inclUdina le-;ting for •.,l,r,,_l,,i�r` <br /> ❑ Yes ❑ No Were all tank:gauging probes visually inspected for d :_age and residue buildup? <br /> ❑ Yes El No* Was accuracy of system product level readings tested? <br /> 0 Yes ❑ No* Was accuracy of system water level readings tested? _ <br /> ❑ Yes ❑ No's Were all probes reinstalled properly? <br /> ❑ Yes ❑ Noy` Were all items on tLe equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when th -e deficiencies were or'w°ill be corrected. <br /> Check this box if LLDs are not installed. <br /> G. Line Leak Detectors (LLD): <br /> Com let e the foliowin checklist: <br /> Ll Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated w Verify LLD performance? <br /> ❑ NIA (Check all that apply) Simulated leak rate: ❑3 g.p.h.; ❑ 0.1 g,p.h; ❑0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Ll Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes D No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> NIA <br /> J Yes ❑ No* For electronic LLDs, dots the turbine automatically shut off if any portion of the IIaonitoring system is disabled <br /> ❑ NIA or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> ❑ Yes 0 No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ NIA <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br /> f. <br />
The URL can be used to link to this page
Your browser does not support the video tag.