Laserfiche WebLink
Mr. Ron Rowe CAMBRIA <br /> July 16, 1997 <br /> Two samples were analyzed from the soil excavated for the new tank vault. No TPHg,BTEX,MTBE,or <br /> total lead were detected in either of the samples. This soil from the new tank vault was used to backfill the <br /> former tank pit on August 24, 1997. <br /> We appreciate your assistance with this project. Please call if you have any questions or comments. <br /> Sincerely, <br /> Cambria Environmental Technology,Inc. GO01Tdo��0� <br /> D�pFO< <br /> A . <br /> _ 0O N\ <br /> Paul Waite No. 5747 <br /> Project Engineer <br /> s <br /> l9TF�F CAUf0P�\P <br /> N. Scott Ma Leod,R.G. <br /> Principal Geologist <br /> Attachments: A-Standard Tank Removal Sampling Procedures <br /> B-Analytic Reports for Soil Samples <br /> cc: Mr.A. E. (Alex)Perez, Shell Oil Products Company <br /> F:\PROJECI\.SHEL \Mmt1071\REPORT,WPD <br /> 4 <br />