Laserfiche WebLink
used, be sure a dedicated, grounded outlet is <br />used. Conduit must enter controller where <br />t prepunched conduit holes are provided. <br />C. Dig trenches as necessary, and install conduit <br />from the controller to each probe location. <br />Probe wire must enter controller through the <br />proper prepunched conduit holes. <br />D. The conduit can enter the probe manhole <br />through the bottom or side. The end of the <br />conduit should be as high as possible to <br />reduce the chance of water covering the junc- <br />tion box during heavy rain. <br />E. Lay 3/4" rigid metal conduit from each probe <br />to a junction box or wiring trough. located in- <br />side the building. Conduit must enter control- <br />ler where prepunched conduit holes are <br />provided. No other conduit entry is permitted. <br />WARNING: Explosion may occur if other <br />wires share the X76 ETM's probe wire con- <br />duit. Conduit from probes to controller must <br />not contain any other wires. <br />' WARNING: Explosion and equipment damage <br />may occur if conduits do not enter the con- <br />troller through their designated prepunched <br />conduit holes. <br />' Failure to comply with these warnings could <br />result in serious personal injury, property loss <br />and equipment damage. <br />' Wiring between the probes and the controller is <br />designed with limited electrical power to probe <br />wires so there is insufficient energy to ignite fuel. <br />To maintain this safety feature, probe wires must <br />be installed in a separate conduit from all other <br />wiring. Probe wires MUST NOT be run in same <br />conduit as power wires. <br />' 3.4 Probe Junction Box And Vapor <br />Seal Installation <br />' Install a vapor seal at both ends of the conduit. <br />One end must be at the probe end of the conduit <br />and the other end before the the conduit enters <br />the building. Install a weatherproof electrical junc- <br />tion box with a gasketed cover at the end of each <br />conduit at the probe location. <br />' 3.5 Probe Wiring <br />Pull the twisted pair shielded cable. #22 AWG or <br />heavier, between the controller and each probe <br />location. The wires must be designed for use in <br />the presence of gasoline and/or oil, and the con- <br />duit must be sealed in accordance with the Na- <br />tional Electrical Code, (NFPA 70), and meet the <br />specification pertaining to the product being <br />monitored as defined by Flammable and Com- <br />bustible Liquids Code, (NFPA 30), and other <br />local codes, since they pass from a Class I, <br />Division 1 area into a non -hazardous area. <br />WARNING: Explosion may occur if other <br />wires share the X76 ETM's probe wire con- <br />duit. Conduit from probes to controller must <br />not contain any other wires. <br />4.0 COMPONENT INSTALLATION <br />WARNING: The installation and use of this <br />product must comply with the National Electrical <br />Code, federal, state and local codes, and any <br />other applicable safety codes. In addition, take <br />the necessary precautions during installation, ser- <br />vice and repair to prevent personal injury, proper- <br />ty loss and equipment damage. <br />WARNING: Turn off power to the system before <br />opening the front panels to avoid shock from the <br />power supply. In addition, power to the system <br />must be turned off before opening or securing the <br />barrier cover. If high voltage is shorted across <br />any barrier probe terminal, explosion or fire could <br />result. <br />4.1 Controller Installation <br />Mounting: Select a mounting location on the in- <br />side wall of an enclosed building, protected from <br />severe vibration and extreme temperature. The <br />monitor should be mounted with the LCD at eye <br />level. <br />Wiring: <br />A. Open controller cover, remove the screws <br />holding the barrier plate and remove the plate. <br />B. Locate the input power terminal on the left <br />edge of the board between the top and bottom <br />edge of the board. See controller wiring con- <br />nection diagram on page 16. Connect the <br />wires from the breaker box to the controller, in- <br />cluding the earth ground. <br />Figure 47: A 1 t j m n5lan>uui I. <br />