My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
334
>
2300 - Underground Storage Tank Program
>
PR0231665
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 4:44:20 PM
Creation date
11/7/2018 4:53:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231665
PE
2361
FACILITY_ID
FA0003714
FACILITY_NAME
LACHHAR CHEVRON*
STREET_NUMBER
334
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26115041
CURRENT_STATUS
02
SITE_LOCATION
334 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\334\PR0231665\BILLING 1985 - 2004.PDF
QuestysFileName
BILLING 1985 - 2004
QuestysRecordDate
3/3/2017 12:45:56 AM
QuestysRecordID
3347324
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• STATE OF CAUFORNIA • •<• ""e <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. `�t,�G1,M,• • <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE REM ❑ 2 INTERIM PERMIT a 4 AMENDED PERMIT 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 'c6y-� 5 A— 0f <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.• 3 <br /> B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A. 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C 1e REGULAR UNLEADED a 3 DIESEL ED6 AVIATION GAS <br /> ❑ 2 PETROLEUM [:] 80 EMPTY 1 PRODUCT ❑ 1b PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 1C MIDGRADE UNLEADED 06 JET FUEL � 8 M85 <br /> ❑ 3 CHEMICALPRODUCT 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER IDESCRIBE IN ITEM D.BELOM <br /> 0. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A S.N <br /> 111. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C.AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR UNER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL Y3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM 8 100% METHANOL COMPATIBLE W/FRP <br /> (PHm9ry Twk) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ W OTHER <br /> C.INTERIOR ❑ I RUBBER UNED 71 2 ALKYD LINING 3 EPDXY LINING 4 PHENOLIC UNING <br /> LINING OR ❑ 5 GLASS LINING t9 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP �(�4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION �c <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE 0 9 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,B1F SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL P_WENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES_ NO 1G STRIKER PLATE YES_ NO_ DISPENSER CONTAINMENT YES L NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLEPIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL 2 DOUBLE WALL A U 3 UNED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC) 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING 2f 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION t MEcxuam LINE IFAI{ ❑2 LINE no3 W 3=Nua NTERST 4 ELEcmoaC LINE 5 urtownc mo ❑ 5e OTHER <br /> OE1ECi0R IESTIN9 MONRIXVIN, EFAN OETECiOR 9Uf00WN <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 2 RECONCILIATIONMANUAL INVENTORY E] 3 MAOONOTORING 4 GAUGINGAUTOMATIMONITORING <br /> TANK ❑5 GROUND MON TORINGTER F-18 ANNUALTESTING <br /> 7 MON INUOU INTERSTTAL ❑ 8 SIR ❑ 9 WE KLY MANUAL F]10 TESTING Y TANK ❑ 95 UNKNOWN c:] 99 OTHER <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PUCE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO ❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE PEST OF MY KNOWLEDGE, IS TRUE AN CORRECT <br /> n w,y zANK33INNGRS NAME DATE <br /> (PRINTM&SNUNRE) <br /> {_Ltnti. GL$ 0 <br /> LOCAL AGENCY USE ONLY THE STATE I.D R IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUN JURISDICTION# FACILITY# TANK# <br /> STATE I.Dl m <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE —7 ERM1T EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APP ONFORM A,UNLESS A CURRENT FORMA HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT L LE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING TH RGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.