Laserfiche WebLink
11/17/98 17:00 TITRIOUBBER a 444 • N0.041 P006/010 <br /> Whenever the tanks are stored at the site,chock them in place to WARNING:When the tank is under pressure,the manways and/or <br /> prevent rolling.(See Figure 1-2).To them down d high winds are fittings may dislodge or the tank may rupture and result in death, <br /> expected. I severe personal injury,or property damage.Before beginning the <br /> After delivery and before preinstallation testing,visually inspect test notify all people on the thst site to rennin in a safe location. <br /> the entire exterior surface of the tank for signs of damage(holes, ALWAYS ATTEND THE TANK DURING THE TEST Avoid extended <br /> cracks or deep scrapes) exposure to the manways,fittings and ends of the tank during <br /> Verily that all ofthe sale-delivery provisions of the Xerxes"Damage the test. <br /> Free Delivery'program have been followed.Sign the drivers WARNING:The maximum test pressure is 5 PSIG(3 PSIG when <br /> release farm. �pressure readugSxipressure can be eargauge must beiy,read at all times.boned <br /> MAX <br /> 5 PSIG <br /> 0 <br /> FIGURE 1-2 <br /> n ( <br /> PREINSTALLATiON TESTING )All Xerxes tanks are meted prior to shipment but R is required that I all tanks be tested phorto installation in orderte verify the absence <br /> of shipping and handling damage.In the unlikely event of a leak,d <br /> is mast likely to develop at a manway or a fifling.Atter installation <br /> and before backfilling to grade,the fest must be repeated to vertry <br /> that no damage has ocaxred during installation.Reter to the 2a.' SINGLE WALL TANK TEST <br /> appropriate section below for the irsbuctorrIs for testing a single 1. Open one service fitting.Check to see that all remaining service <br /> wall tank a double wall tank with a dry itterstitkll space or a double fillings are property doped,plugged and tightened, <br /> wall tank with a liquid-filled interstitial space. 2. Install the test manifold in the open service tilting.Connect the <br /> If damage is defected,DO NOTATTEMPT REPAIRS.Contact the pressure source to the test manifold.(See Figure 2-2). <br /> UST Coordinator at the Xerxes plant nearest you or the Technical <br /> Service Departmetrt at Xerxes'corporate office.Telephone numbers 3. Pressurize the tank In 5 PSIG(3 PSIG when testing a 12-foot <br /> are found on the last page of this manual. tank).Add or remove air as necessary and allow the pressure <br /> to stabilize. <br /> gauge uctmu a test a ama d u full- in Figure ng The air supply q Close the valve on the test manifold.Disowned the air <br /> gauge must have a maximum full-scale reading of 15 PSIG with <br /> 114 or 1/10 lb.increments. supply line. <br /> WARNING:The pressure relief device or regulated air source must 5. Monitor the pressure for one hour Soap the entire exterior of <br /> he rated at a maximum of 6 PSIG(4 PSIG for 12-foot tanks)to the tank and watch kxr active air bubbles which indicate a leak <br /> reduce the risk of vorpressurmng the tank. 6. When the test is complete,carefully release the air pressure <br /> The tester is responsible for verifying that all of the test equipment from the tank by opening the air supply valve.The air supply line <br /> is in good working condition and properly configured. should already have been disconnected.Remove the test manifold. <br /> FROM COMPRESSOR <br /> FROM COHRESSOR <br /> AIR SUPPLY VALVE PRESSURE RELIEF DEVICE AIR SUPPLY VALVE <br /> AIR SUPPLY GAUGE <br /> PRESSURE RELIEF AIR SUPPLY GAUGE SERVICE FITTING <br /> DEVICE <br /> SERVICE FITTING <br /> TEST MANIFOLD <br /> FIGURE 2-1 FIGURE 2-2 <br />