Laserfiche WebLink
11/17/98 17:00 TITAOUBBER � 444 • NO.041 P007/010 <br /> r r r. 2. Open the mon tDr filWtg not connected to the has.quidC <br /> disconnect assembly. <br /> WM YOW Milk may acme On she whh a hDSCkk errantly(see FVUM 2a HV) 3. Pressurize the primary tank to 5 PSIG;add or remove air as <br /> DY with a Quirk Dismnreot assembly(see ngure 2-30 D).H the tank is not necessary and allow the mdepmrd as sharm n etre o1 the&SiTao"onor rd pre-iRstallaliul teshrhg,dne <br /> l presm to Stabilize.Close ft valve On <br /> the Xer>r>a>:madnaluir at ereD"neahastyou orox Mdmial sarvices departrriad the test manifold supply line, <br /> 4 XanaW hicdaamMrs- 4. Monitor the pressure for are holo Soap test all service fittings <br /> HOSE/VALVE ASSEMBLY and manways.Watch for active air bubbles which indicate a leak. <br /> NOTE In order to test the tank,the hose/valve assemhy must be=wcled hom a <br /> mmimr rd ng to a service%rig. TIE <br /> PRIMARY(INTMMAL)UIHK TEST <br /> 1. Open one service ftbng and the monitor fitting which is not ; E RELIEF oEv1cE <br /> connected to the hoseArdlve assembly Check to see that all <br /> remaining service and monitor fittings are property doped,plugged O 1 orscnaa cr Ake 5 rPLY VALVE <br /> and 41nloned. 5cohmer AIR uPPLY ALVE <br /> UM <br /> 2. Gose the valve on the lose/VdIV6 assembly.Install the test rnNhroe FUTIM — SERVICE rrTTIW <br /> manifold in the open service fitting.Connect the pressure source <br /> to the test manifold.(See Figure 2-3 HV). <br /> 3. Pressurize the primary(internal)tank to 5 PSIG.Add or <br /> remove air as necessary and allow the pressure to stabilize Glose FIGURE 2-3 00 <br /> the valve on Cue test manifold. <br /> 4. Monitor the pressure for ore hour.Soap all filOngs and man- SECOKU (p(TIMNALITANKTEST <br /> ways and watch for active air bubbles which Indlnabi a leak 1. Mantaeh the pressure in the primary tank <br /> 2. Plug the monitor fdUng which was previously open.See Step 2. <br /> PRE^"C RELIEF DEV ICE 3. free the how from the serVlCe ftM by cubing the nylon be. <br /> HOSE/VALVE AFJT71� <br /> FROM COMPRESSOR 4. Insert the those into to quick disconnect check valve(found at <br /> AIA "PLYSUPPLYVALVE the top Of tithe service fdthhg).This will allow air to trarrstr hom the <br /> MANIFAIR JCEFIGAD�GE primary to secondary tank <br /> MONITOR °ERV I LE FI iTINO 5. Presstake to 5 PSIG.Aid or mm air via the supply valve as <br /> I needed and aW the pressure to SWAM.Gose the valve on the <br /> test manilold.Discamdtthe air Soppy line. <br /> B. Monitor the pressure for one hau.Soap the entire exterior of <br /> the tank and watch for active air bibbim which indicate a leak. <br /> FIGURE 2-3 HV When the test is complete,camf*release the air pressure horn <br /> SECONDARY(EXTERNAL)TANK TEST the tank by opening the supply We.The air supply lire already <br /> should have been dscmrredl d.V4=tte air flow from the supply <br /> CAUTION:Do not pressurize tine secondary tank(interstitial space) valve stops,remove the test manifold, <br /> directly or the primary tank may rupture and cause tank Wore. <br /> Once to valve on the hose/valve assembly has been opened,do <br /> not close it until all testing is complete and all East pressure has 2c. DOUBLE WALL TANK WITH LIr r r <br /> been released. <br /> 1. Maintain fie pressure on the primary tank Plug the monitor PRBNARY(INTERNAL)VM 700 ----—- <br /> fdting which was previously open.Skawty open the valve on the cone KM ft tahkvrdal roe o w Wwri)Offro tee mebtsMBatlon onang <br /> hose/valve assembly and Pressurize the secondary(edernal)tank orae trine mr/drain tram ne mse m. <br /> to 5 PSIG.Add or remove air as needed and allow the pressure to 1. Open Orbe service filling and the filling on the reservoir Check <br /> stabilize.Close the valve on the test manifold.Disconned the air for liquid in the reservoir—it MOM be oleo!half full.Do not <br /> supply line. open the monitor fittings—brine wi be lost.Check to see that all <br /> 2. Mondor the pressure for one hour Soap the entire exterior of remairim service and monitor fdtings are property dopetl,plugged <br /> the tank and watch for active air bubbles which indicate a leak and tigntanw. <br /> When the test is complete,carefully release the air pressure from 2. Urs *check the interior of the tank for liquid—there should <br /> the tank by opening the air supply valve.The air supply lire shout d not be any.ttstall the test manifold in the open service titling. <br /> already have been disconnected.Renhove ft test marhtokf. Conned the presvrre sattrce to the test manifold (See Figure 24). <br /> QUICK DISCONNECT ASSEMBLY <br /> 3. Pressi0iM the primary(Internal)tank to 5 PSI&Add or <br /> remove air as necessary and allow the pressure to stabilize.Close <br /> r4re:n migr Mit est k mmary rarMan to in .the as r¢sa nest not be cauecied the valva On the=mar/told.DWMr ll the air supply line. <br /> F hie ARY Hmrq— AL)T NK temper- 4. Monitor the pressure for one holly Soap all fillings and man- <br /> ways and watch Por active air bubbles which indicate a IEak Check <br /> I. Conned the test manifold to an available service fitting.Check the reservoir for bubbles in the monitor fluid. <br /> to see that all remaining service finings are properly doped, 5, fielease the <br /> plugged and tightened pl from the prknary tank <br />