My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:08 PM
Creation date
11/7/2018 5:06:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/17/98 17:01 TITROUBBER 4 444 • NO.041 P008/010 <br /> 4. EXCAVATION <br /> • FRpM CDHRRE550R PRESSU+E RELIEF D VILE The installing contractor must take all p2raufions necessary to <br /> AfR SUPPLY VALVE RESERvofR Frrriiic Protect employees working in or rwr a tank excavation.These <br /> AIR 5UPPLY GAUGE PITC8"OnS should include,but are not limited ro: <br /> SERVICE FITTIMa •IOraoon and protection of atter dRy insUlabkas near the <br /> excavation before opening the excavation; <br /> Means of securing the walls of the excavation; <br /> Means of Preventing exposure of emptayees to hazardous <br /> fumes from the excavabon: <br /> Protection of employees from hazards associated with water <br /> FIGURE 2-4 accumulation in de excavation; <br /> •Barricades,etc.to prevent UnauMO112e11 vehicle or pedestrian <br /> SECONUARY(EXTERNAL)TANK AST traffic; <br /> CAUTION:Do not pressures the secondary tank(interstitial space) •Inspection of the eimavabon and surrounding area at least daily. <br /> or the primary tank may rupture and rause tank failure. For additional information on WAvaDon,reaching and staring <br /> Check the exterior of the tank for monitoring liquid—if liquid is safety practices,consuft OSHA's Construction Industry Standards <br /> found,wipe the tank dry and verify that the liquid does not Part 1926,Subpart P <br /> reappear. Lift the tank to check the bottom.Do not roll the tank. The minimum dephr of the excavation is normally determined by <br /> DANGER:Do not stand under the tank while it is being lifted. the presence Gr absence of groundwater and the presence or <br /> When the test is complete,remove the test manifold.Usually absence of traffic at the site.Thrse dimensions are critical to the <br /> check the interior of the tank for Rquid.Replace the protective successful installation of a tank and are often regulated by code. <br /> covers in the service filling and the reservoir filling. Reter to: <br /> •federal,state and <br /> 3. BACKFILL AND BEDDING leaf codes <br /> Xerxes tanks must be inStalled usingeider •NFPA 30 8 API 1615 <br /> Pea Gravel or casted <br /> stone which meets the following spcd •figures 41 to co <br /> ficatiens. 4-4 below. <br /> GENERAL The material is washed and free flowing and mmonns ' 6' <br /> to the specification of ASTM C-33 pat 9.1,sizes 6 through 8.No rens x un e ns in Ixarx�I 1 <br /> more than 5%(by weight)of the material may pass through a#8 <br /> nks <br /> sieve, It is recommended that the supplier certify that the material ;;- <br /> conforms to ASTM C-33 and any other applicable specifications. <br /> cairn rAs <br /> (For additional information,refer to the Xerxes pamphlet Rberglass mAFFtc <br /> 5nk Back/ll Guidelines.) <br /> PEA GRAVEL CRUSHED STONE <br /> Il <br /> RGURE 4-1 <br /> I/8" 1/8 <br /> Tanks subjected to traffic loads must have a rover depth of at least <br /> 18[36)incites of backfill plus 9 inches of asphalt.An acceptable <br /> atterrative is a minimum of 18[35)inches of backfill plus 6 inches <br /> of reinforced concrete. <br /> ® r9 <br /> P 6- <br /> FIGURE 3-1 <br /> FIGURE 3-2 [ vE <br /> cvotr«rs <br /> PEA GRAVEL Mix of rounded particles —sizes between 1/8" <br /> and 3/4". <br /> CRUSHED STONE:Mix of angular particles—sizes between 1/8" WIM,Numbers in brzdrers f l <br /> and 12". 12• refer to lZ tanks. <br /> NdrE:II maiera rmxtl meets mese SWdubgm is nd avalUble.connect the FIGURE 4-2 <br /> xerim EVQI x rep Service Dew,Imeni for Intortmrim m mprovea abnnare <br /> roil'—Ua U..N omc,M. R'.o ,.g era=,WkfalWreTsnhs subjected m traffic 10a&8114 high vvaMve r must haa <br /> nCSull in 1lank <br /> ''e� leruls %Pixel'prpr wnRer'appmral roll roil kne tank viananry and minimum of 30(36)inches of backm and either 9 inches of <br /> lln'/ . <br /> asphalt or 6 inches of reinforced concrete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.