My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:08 PM
Creation date
11/7/2018 5:06:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/17/98 17:02 TITAN UBBER i 444 • N0.041 P010/010 <br /> For further information=morning fabric specifications and instal- SUMMARY <br /> Laron procedures,consult the filter fabric suppliers installation I. Prepare to tank bed, <br /> guides or instructions. 2. Set and keel the tanks. <br /> To install fitter fabric,typically fitter fabric manufacturers recom- 3. Measure the tank diameter. <br /> mend that the installer line the excavation sides and bottom with 4. Install holddown hardware(if applicable). <br /> the fabric.Overlap adjoining panels by at least twelve inches. 5. Place and probe the first two Iffte of backfill material. <br /> Place backfill material an the panels around the edge of the hole 6. Add backfill to the top Of the tank <br /> to anchor them in place. 7. Measure the tank diameter and repeat the air W. <br /> In wet-hole conditions, use backfill material to sink and hold the Ager the air test and measurement of tank deflection are success- <br /> fabric in place on the hole bottom. fully completed,It is recommended that the tank be ballasted until <br /> piping instalW6on and final backfilling to grade is completed.When <br /> 5. DRY eLE INSTALLATION filling the tank male sure that the tank is adequately vented.The <br /> GUTION:Xerxes recommends that every site be thoroughly vent crust be large enough to avow the displaced air to escape, <br /> evaluated for the potential to trap water or otherwise subject the WM Do not babs!the rave urd of henna/Is cm with me top Of the rano <br /> tank to a rise in the local water table.Xerxes recommends that all WARNING:If product is used as ballast,exercise special care m <br /> tanks be anchored in installations in which water may enter to handling.Safeguard against sparks,fire or product spills.Improper <br /> hole.failure to anchor the tank in a wet hole may damage the tank handling of product can cause a fee or explosion,and death, <br /> or surrounding property. severe personal injury or property,damage- <br /> Prepare a smooth,level bed, 12"thick,of approved backfill <br /> material.flare to tank or tanks onto to bed.Do not set Xerxes rINSTALLATION <br /> tanks directly onto a concrete slab or on timbers,cradles or WpRNB�;Do not use air presswe to test tanks that curtain dant <br /> directly ode the tale bottom- enable or combustible liquids,or vapors,and do not perform any <br /> Leweling:As the tank is being placed,set the tank pitch as shown post installation pressuretest.The fuel and air mbdum may explode <br /> on the site plans.Xerxes does not require that a tank be pitched. and Muse death,severe personal injury,or property damage- <br /> All pitch is determined by the tank owners specification.It a double CAUTION:Never allow an empty tank to remain in a wet hole,or a <br /> wall tank is pitched,the monitor should be at the low and.Use the dry hole goat may became wet unless anchoring and backfilling <br /> tops of the ribs to establish longitudinal level.Establish lateral level Ihave been completed.Failure b anchor and backfill may damage <br /> by placing the level across the top of a fitting,a manway or a collar. the tank or surrounding property. <br /> When the tank Is placed,I&the first diameter reading(Dell don 1011 DOWU reaNhps to be tyerh in stno wo smear to steps dwft in <br /> reading';1 on the checklist).See Section 13 for instructions on seatim S. <br /> taking deflection readings. Pump the wafer from the We to maimain minimum water level. <br /> If the tank is to be anchored,install the andnring hardware at this Add a minimum of 12 Ides of well-placed backfill material to the <br /> tone(See Section 7). hole,and level the bed to assue uniform bottom support for the <br /> BACKR WNG tank.Position the tank in the hole. <br /> Use onlyapproved backfill material(See Section 3).Do not mix Partially ballast tank until 4 sables firmly on the prepared bed. <br /> approved Magna)with sand or native soil.Do not use native soil Ballast level in a tank must rear exceed wafer level in hole during <br /> as backfill material.All excavated naM soil must be replaced with installation.Use only enough ballast to sink the tank unfit barMll <br /> approved material.Place one 12"lift of material event'around the trial is even with the top of the tank <br /> tank.From the hole side or the top of an adjacent tank wok the WARNING:t product is used as ballast,exercise special care in <br /> material by hand completely beneath foe tank body and domes to hardy g.Safeguard against sparks,fire or product spills.Improper <br /> provide full support.Use a nonmetal probe bar king enough to dandling of product can cause a fire or explosion,and death, <br /> reach beneath the tank and push the backfill in place.Repeat this severe personal injury or property <br /> step with a second 12"lift After the second lift of material has been — <br /> placed and probed,the baddit can be brought to the top of the After leveling tanks,the anchoring procedures in Swfiuh 7 must <br /> tank without further hand work. be followed. <br /> tWTION:Do not strike the tank with the probe bar.The tank may Backfill must be added evenly after anchoring,and remaining <br /> be damaged and require repair dry hole backfilling procedures should be followed as stated in <br /> Section S. <br /> WE Can;depth must roil mrirun depth 9pedfied in section 7 at th e <br /> RIGHT WtRONGireWuctims. <br /> IIIN& ANEEM Nmte It is ream rded to•e tr*be cam;Iftb ballasted mrd baddil Is even <br /> I With the top of the tan <br /> III <br /> fill <br /> I <br /> FIGURE 5.1 FIGURE 5-2 <br /> When the tank is backfilled to the tank top: <br /> •take an intermediate diameter reading as an in-process cetic. g� <br /> repeat the 5 PSIG(3 PSIG for 12-foot tanks)air test as <br /> outlined in Section 2,soaping all exposed arm of the tank "- <br /> and all fittings. FIGURE S-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.