My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:08 PM
Creation date
11/7/2018 5:06:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/17/98 17:06 TITROUBBER i 444 • NO.042 P001 <br /> For further information concerning fabric specihrabons and instal- SUMMARY <br /> Won procedures,consult the filter fabric suppliers installation 1. Prepare the tank bed, <br /> guides or instructions. 2. Set and level the tanks. <br /> To install filter fabric,typically fitter fabric man6dacturers rewm- 3. Measure the tank diameter. <br /> mend that the installer line the excavafion sides and tiohom with 4. Install holddown hardware(if applicable). <br /> the fabric.Overlap adjoining panels by at least"Ne inches. S. Place and probe the first two lifts of backfill material <br /> Place backfill material on the panels around the edge of the role 6. AMhaddll to the top of the tank. <br /> ID anchor them in also:. 7. Measure the tank diamefer and repeat ft air W. <br /> fa wets hole cm n the hans,use backfill material to sink and hold the After the air test and measurement of tank deflection are success- <br /> fabric in place on the tale bottom. fully completed,it is recommended that the tank be ballasted until <br /> piping irrYallatim and final hard"to grade is completed.When <br /> 5. DRY rLE INSTALLATION filing the tank make sure that the tank is adequately vented.The <br /> CAUTION:Xerxes recommends that every site be thoroughly vent must be targe enough to allow the displaced air to escape. <br /> evaluated for the potentia)to trap water or oftrwise subject the WM'°o nam bWW ee ark Hadi the badelt is ewn with me top or tic tank <br /> tank to a rise in the local water table.Xerxes recommends that all WARNING:If product is used as ballast,exercise special care in <br /> tanks be anchored in installatms in which water may enter the handling.Safeguard against sparks,fire or product spills.Improper <br /> hole.Failure to anchor the tank in a wet hole may damage the tank handling of product can Cause a fire or explosion,and death, <br /> or surrounding property. severe personal injury or property darnage. <br /> Prepare a smooth,level bed,12"thick,of approved backfill eINSTALLATION <br /> material.Place the tank or tanks onto the bed.Do not set Xerxes 6. WET <br /> tanks directly onto a concrete slab or on timbers,cradles or WARNNG:Do not use air pMMR to hest tanks that rxxnain flam- <br /> dimcdy onto the tole bottom. mable or comWstible riquids,or vapors.and do not perform arry <br /> Leveling:As the tank is being placed,set the tank prtrih as shown n postinstallation pressure fast The tied and airmodure may explode <br /> on the she plans.Xerxes does not require that a tank be pitched. and rause death,sdhwe personal injury,or property damage. <br /> All pitch is determined by the tank owners specification.If a double CAUTIOw Clever alloy an empty tank to remain in a we hole,or a <br /> wall tank is pftdwd,the monitor should be at the low end.Use the dr hole that <br /> tops of the ribs to establish longitudinal level.Establish lateral level may escort it unless anchoring and may <br /> damage <br /> by placing the level across the top of a fitting,a mammy or a collar. the f been completed.failure rt anchor and backfill may damage <br /> the tank or surroading property <br /> When the tank is placed,take the first diamheter reading(peflection tore WW=m"ID ce hrren in wqcm similar to saps tla9vlDed in <br /> reading'A on the caeddist).See Suction 13 for insotrcfions on semen S. <br /> taking deflection readings. Pump the water from the hale to maintain minimum water level. <br /> If the tank is to be anchored,install the anchoring hardware at this Add a minimum of 12 adds of well-placed badddl material to the <br /> time(See Section 7). hole,and keel the bed to assure uniform bottom support for the <br /> BACKRWNG tank Position the lank in the hole. <br /> Use only approved backfill material(See Section 3).Do not ma Partaly ballast tank until it settles firmly on the prepared bed. <br /> approved material with sand or native soil.Do not use native soil Ballast level in a tank must new exceed water level in hole during <br /> as backfill material.All excavated native soil must be replaced with inGtMation.Use only enargh bait to sink the tank until backfill <br /> approved material. Place one 12"lift of material evenly around the material is even with the top of the tank. <br /> tank.From the hole side or the top of an adjacent tank work the WARf6NG:If product is used as ballast,exercise special care in <br /> material by hand completely beneath the tank body and dames to handling.Safeguard against sparks,fire or product spills.Improper <br /> provide full support. Use a nonmetal probe bar long enough to handling of product can cause a fire or explosion,and death, <br /> roach beneath the tank and push the backfill in place.Repeat this severe personal injury or property carnage• -- <br /> step with a second 12"lift.After ft second lift of material has been After ,the ardarimq Procetlure5 in Section 7 must <br /> placed and probed,the backfill can be brought to the top of the be lalkraved. <br /> tank without further hand work <br /> CAUTION:De not strike the tank with the probe bar.The tank may Batlfill must be added evenly after anchoring,and remaining <br /> be damaged and require repairdry hole backfilling procedures should be followed as stated in <br /> I Jill <br /> R I GHT VIII_ WRONG IIII ww worn ren est"'e'""'°e)»"spec"ed"Sec°°"'°'e es` <br /> II !N I I Note It Is rKwrv;wo*1 Mat de tar be cmVd*Mlasted once baddlw is even <br /> II with ave by of rhe rank. <br /> II_ <br /> FIGURE 5-1 FTGURE5-2 — — <br /> When the tank is backfilled to the tank top: <br /> •tabs an rrdermediate diameter reading as an in-process check. F <br /> •repeat the 5 PSIG(3 PSIG for 12-foot tanks)air test as <br /> outlined in Section 2,soaping all exposed areas of the tank <br /> and all fittings. FIGURE 6.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.