My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
4075
>
2300 - Underground Storage Tank Program
>
PR0231667
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 4:23:08 PM
Creation date
11/7/2018 5:06:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231667
PE
2361
FACILITY_ID
FA0002121
FACILITY_NAME
JAMAR SERVICE
STREET_NUMBER
4075
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
15726411
CURRENT_STATUS
01
SITE_LOCATION
4075 E MAIN ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\4075\PR0231667\1999 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11i17i98 17:06 TITANRUBBER 444 • N0.042 P003 <br /> NowiguWN STRAPS: <br /> Xerxes PRP straps must be used when a tank is to be anchored. <br /> The localion of hoWdown straps for each tank is marked an the i <br /> tank ty the arrow(X)symbol.Complete data for hoiddown <br /> soaps are given in Table 7-2 and Figure 7-2.CAUTION:Placethe straps onlyin the locatia)s designated by the <br /> arrow symbol N)Tc evenly distribute buoyancy loads,lighten as holddowm straps <br /> uniformly unto they are snug over the ribs but cause no deflection <br /> of the tank.Malo:an intermediate measurement of the tank diame•ter AFTER the straps have been Installed and lightened. <br /> HARDWARE MO ANDIORING POINTS: <br /> Ancrorirg hardware and anchor paints must be Siad according.to RIMIRH7yt <br /> Table 7-3 and manufactured to industry standards and dhnensions. <br /> The installing eonoactor is responsible for providing(hardware and <br /> anchor points of sufficient strength.The particular carrfiguarbon B. POSTINSTAILLATION TESTING <br /> of hardware will be determined by the owner or the owners WARNW6:Do not use air premn to test tanks that contain <br /> representative.Locate the ander points as shown in Table 7-2 fiarrurhable or combustible I <br /> and Figure 7-2.Peter to dimension"E".Align all anchor points with liquids or vapors,and do not pe form <br /> the marked(y()location on the tanks,within a tolerance of ± 1". arry Post nstafla cin pressure test.The hreltair mtdure may <br /> For specific information onon hardware and its use,consort the Mode and cause death,severe personal injury or property <br /> hardware manufacturer. damage.Taroks that will be ballasted with a flammable product <br /> should be air tested before ballasting. <br /> G LITION:Use only appropriate seed hardware with the strap WARS U product Is used as ballast,exercise s <br /> eye.Ovemized hardware may damage the strap eye and result pedal care in <br /> in personal injury or property damage.See fgure 7-4 for sb ap handling.Sideguardagainst Spiks,fire or product spifls.Improper <br /> of product duct can mm a fire or explosion,and may result <br /> eye dimensions in death,severe personal 4"d property damage. <br /> TABLE 7-3 INTERMEDIATE DEFLECTION MEASUREMEIR <br /> MINIMUM TURNBUCKLE DIAMETER MINIMUMAfterrm <br /> 9f ba"I is brought to the top of the tank,male an inteediate <br /> 1ANN (9YlYPE) WIRE RDPE in Sectrin 13. of vertical defbeebrm according lo the instructions <br /> N Section 13. <br /> DIAMETER HOOK JAW EYE DlA1YEYER T'ES'T <br /> 4' 314" 12" 12' 3B" After the tank has been measured and vertical deflection is dder- <br /> 6 3+4" 1/Y 12" ala^ mined to be within are bads spadfied by Xerxes.the tank must be <br /> e' 11/4" 3/4^ 3k" 12' Pressure 18SW to ensure the no damage oaxured during installa- <br /> tion.The procedure in Section 2 Pre-uhslaaatnm Testing should be <br /> 10' 14/4" 3/4^ 3/4^ 12" lollowed,soaping as exposed areas of the tank and all filings. <br /> 17 1 /4" 3/4" 3/4" - 12" Because most of the tank adenar is no kilter visible,the tank <br /> must be tested by checking the gauge for ane hour at the test <br /> manffold tax any drop in pressure.Carefully relieve the pressure in <br /> the tank and d appiicable remove the hose/valve assembly or quick <br /> 3AA- disconnect assanby horn dry Double Wall tanks. <br /> 1 <br /> WARNING:Do not use au pressiure to test tanks that contain <br /> flammable or combustible kqudds or vapors and do not perform <br /> arty post inshagatiori pressure M The WAY mixture may <br /> explode and Cause death,severe personal injury,or pmperty <br /> damage.Tanks that wee be 6Nasod with a flammable product <br /> FIGURE 7-4 should be air tested beide ballasting. <br /> WARNING:If product Is used as ballast,exercise special care in <br /> handling.Safeguard against sparks,fire or product spills.Improper <br /> handling of pmduc can cam a fire of explosion,and may result <br /> NM Drop•f xW tm wm6uft may be used c pkrx of am m a wrum W in death,sevens personal injury or property damage. <br /> Wre W. The tank may be ballasted alter the baddll Is even with the top <br /> N=AN exposed moat on me holddvnm suras,wrnbi dries a xl/m mmadei rod of the tank and postinstallation testing,d applicable,has been <br /> rose be maW dr gabrah=d m P1�d owrvsim(Figure 7.4A). successfully completed.Only urXW wet-hole conditions as <br /> NM-mw fasan4g wre rope,v a.mik m of thm darnps m each pint dmahlled in Sectien 6,shmM ballast be added before the backfill <br /> USE slhaddo-{ype or ghan M damps as appmpr=(Fight 7-4A). is even with the hap of the tank When filling the tank,make sure <br /> the tank le properly vented.The vent mast be large enough to <br /> allow the displaced air to escape. <br />
The URL can be used to link to this page
Your browser does not support the video tag.