Laserfiche WebLink
11/17/90 17:06 TIT RUBBER 4 444 • <br /> ' NC.042 POk]4 <br /> 1 PIPING AND VENTING 11. SUMPSIBOTTOM <br /> WARNING:All internal piping must be at least 4"[6"for 12'diame- If the tank has a sump or a bottom fitNlg,take extra care that the <br /> far tanks)from the tank bottom, tank does not rest of mll on h prior to installation. <br /> CAUTION:All single wall and double wall tanks must be vended to During installation,provide a dear area in the backfill bedding,so <br /> atmospheric pressurethat the tank rests on the bad fl bedding and the sump or bottom <br /> Refer to Rgure 10-1 and Table 10.1 to determine the correct dimen- fitting is dear.Atter setting the tank fill and tamp the resulting void <br /> sions to sin internal pumps and piping. by thrid Wo:continuag the back ting• <br /> When the tank's iniumttial space is filled with a liquid,the space Kpillill 14 4 1 . , 1 <br /> must be vented.It is sufficient to drill a 114"-diameter hole in the <br /> side or cap of the riser pipe as supplied by the installer.When the When the tank has been set,tested and backfifled,and all piping <br /> groundwater level will be high enough to enter a drilled vent hole, and venting has been completed,the balance of the backfill material <br /> install a vent line from the riser pipe to above grade level. may be added. <br /> When the irters rbal space is dry,ft is not necessary to vent the When the tank has been backfilled to subgrade, take the final <br /> space to atmosphere. dianeter reading(Deflection readuq"B"an the checklist), <br /> It is the installers responsibility to select a thread sealant that is The same material as specified in Section 3 must be used to <br /> compatible with the product being stored.Some sealants cannot completely flf excavation.The barky must be free of debris.Airy <br /> be used with some products.If necessary remove.dean and blocks or bridles used as support material during piping must be <br /> redope all plugs. removed prior to compkdion elf backMirlg.Safety measures,such <br /> as placing barricades until installation is complete,should be used <br /> ^� etE H 'around the expvationatio <br /> • t o c BC rUre flat life Installation meets 8th of tlhe requlft:memS Of <br /> erMEMslw LrMF II W IL YlrfMslm LtIE KTAIL <br /> 91NiLE YALL t 008EE YLLl minimum Cover as specified in Section 4. <br /> 0U49.L yu, i <br /> SCLLE, Irl w.,F, rias <br /> Be sure that the dledlurt 1s pnopery onmpleletl <br /> .e. .E. .M. 13. 1ERECTION <br /> DIPSTICK PREPARATION <br /> Onve a"i-headed,nett-sp'drtdng(e.g,brass)mail halfway i M a <br /> SIMOLE YLLL PIS WTD riui.,. 9p0M airEa YaL 1 dlpshdk 1"above its Close. <br /> RRST13MW 1 READING(PRIOR TO BACKHLL) <br /> 1 -Ill Er11MG Or IF M C ARE W WTT FW in r� {F A <br /> Ir;i6" G.r1T"IYl�°E c�{.[rA _®rra a rrt rAM[ WQ 1. Place the dipstick ntoaservice fdting. <br /> 2 - IMEAIPU 0J.K EAS W MVI 1r " 6AIA'E MATF LLFIM . <br /> 2. Measure and record the distance from the tank bollen to the <br /> FIGURE 141 tap of the fibirg. <br /> 3. Rod ft dipstick up until the exposed nail catches on the inside <br /> TABLE 10-1 top of the tank. <br /> INTERIOR ONER&IONS(IN) 4. Measure the distance from the tank top(inside)to the top <br /> WK - of the fitting.Subtract I"from this measurement and record <br /> aDl "w "6. C. .d. -E" 'F '6' 'N• •I" the distance. <br /> 4' 49.50 54.50 aeon 5150 56.85 x8.00 5. Subtract the second distance from the first and record this <br /> value as reading'Yi on the Installation Cheddist <br /> B 73.00 78.00 71.76 72.75 7275 70 6251 75.125 1 8625 I rias SECOND GWAIE ER READING(AF FER BACKFILL) <br /> t Ir 93.00 9ee0 91.186 92.75 9775 BMW 95.375 100.50 1 91.189 <br /> 1. Place the dipstick ince a service fitting with a standpipe <br /> 10' 121.00 126.0D 119.16 120.75 125.75 118.50 123.50 625 1"9115 installed to subgrade. <br /> ( 12' 139,25 14325 136.6251 1 1 1 2. Measure and record the ds tance from the tank bottom to the <br /> top of the standpipe. <br /> All piping must conform to all applicable codes and standards-See 3. PWA the dipstick up urfl F the nail catches on the inside top of <br /> INTRODUCTION. the tank <br /> WARNING:When pressure testing the piping,the tank must he 4. Measure the distance from the tank top(inside)to the top of <br /> isolated from the piping System.The test pressures for piping ft standpipe.Subtract 1"from this measurement and record <br /> may rause the tank to explode and cause death,severe personal the distance, <br /> injury or property damage. 5. Suhtabt the secoi distance from the first and record this <br /> CAUTION:When extending mondonng or vapor recovery piping to value as reading"B"on the Installation Checklist. <br /> the surface,be sure that the at-ordee fittings are different from any <br /> fill fittings and will not accept standard fill hoses- <br />