My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
2300 - Underground Storage Tank Program
>
PR0231441
>
COMPLIANCE INFO 2006-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 1:15:51 PM
Creation date
11/7/2018 5:12:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2011
RECORD_ID
PR0231441
PE
2361
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\470\PR0231441\COMPLIANCE INFO 2006-2011.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/03/2006 10:22 FAX IA 002/003 <br /> JOL <br /> SAN JOAQU COUNTY ENVIRONMENTAL HEALTH D TY' <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN -PAGE 1 <br /> TYPEOFACTION ® 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION Mut <br /> PLAN TYPE ® MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. <br /> (Check one ire,mly) ❑ THIS PLAN COVERS ONLY THE FOLLDWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> ;;, . <br /> FACILITY ID#(Agmey Use Only) '' '"'' Moi, <br /> FACILITY NAME Beacon Station#3492 MPs, <br /> Mea cITY Manteca <br /> FACLLfrY SITE ADDRESS 470 N.Main Street NANCE <br /> II. EQUIPMENT TESTING AND PREVENTIVE' Jimle etc. be rformcd in Mea. <br /> sum law requires mat testing,pmventivc mainlenanm,and calibration mf monimring cquipincnt(e.g••sensors,Probst line leak demc:mrs, ) pu <br /> accordance with the equipment menufacmmm,instructions,a snnually,whichever is more frequent Such work must be performed by quNified personru:l. Mut. <br /> MONITORING EQUIPMENT IS SERVICED ❑ 1.ANNUALLY ❑ 99-OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring Plan must include a Sire Plan showing the general tank and piping layouts anti the locations wham rrioni[oring H performed(i.e.,location of each senior, <br /> line leak demctur,rnonitvring sysmm r011tm1 panel,etc.). H yna already have a diagram(e.g.,curcent UST Monimring Sim Plan from a Meai[oling System CU[Ilcati0n <br /> form Harardous Materials Business Plan ma arc. which ah Y�I T aANKrMONTTOeRTNG s tan <br /> M1a. <br /> MONITORING IS PF7tFORMED llSINGTHE FOLLOWING METHOD(s):(Chcuk all That apply) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACES)OR SECONDARY CONTAINMENT VAULT(S) MD <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LfQUID FILLER? ❑nus NDER PRESSURE ❑ d.UNDER VACUUM M13. <br /> MODEL#: EM <br /> PANEL MANUFACTURER:Gitbarm MODEL#(S): 42 <br /> M1° M16. <br /> LEAK SENSOR MANUPACYURER:Gilbamo <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATO)SYSTEM USED TO MONITOR Sual F WALL TANKM Mfr, <br /> PANEL MANUFACTURER: MODEL# <br /> M,9. <br /> gd.TANK PROBE MANUFACTURER: M11. <br /> MODEL#(S): M20 <br /> LEAK TrSTPREQUENCY: ❑ a.CONTINUOUS ❑ b.DAE.YINIGHTLY ❑ c.WEEKLY M21 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify) _ W2. W3. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.01 g.p,h. ❑ c.OTHER(Specify): Mid. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUALPER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 <br /> ❑ 4,WEEKLY MANUAL TANK GAUGING(MTO)PER 23 CCR§2645 MI. <br /> TESTING PERIOD: ❑ a,36 HOURS ❑ b:60 HOURS <br /> ❑ S.INTEGRITY TESTING PER 23 CCR§2643.1 M26. Mr. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Sptaafy)' <br /> ❑ 6.VISUALMONITORLNG DONE: ❑ a.DAILY ❑ b-WEEKLY(RW-1—*a1sramaaysn M2a. <br /> ❑ 99.OTHER(Specify):Tank Purtlmad out `y, PIPE MONITORING <br /> Mo. <br /> MONITORING IS PERFORMED USING THE FOLLO GMETHODS)(Check all that apply) <br /> ® I,CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyrRENCH(ES)AND OTHER SECONDARY CONTAINMENT atal <br /> SECONDARY CONTAINMENT IS: [9 a.DRY ❑ h.LIQUID FILLED UNDER PRESSURE ❑ d.UNDER VACUUM Mia <br /> MODEL#: EMC <br /> PANEL MANUFACTURER:Githmco M55. <br /> M]°, MODEL#(S): 208 <br /> LEAK SENSOR MANUFACTURER:Gilbarcri ® a.YES ❑ b.NO M36. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? Mai <br /> WILL PAILUREIDISCONNBCTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWNAND RESTRICTS <br /> sTILICYESS 0 Jr.NO <br /> SHUTS OFF <br /> ® 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p M3a <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED Mas. MODEL#(S): PXIV <br /> MLLD MANUFACTURER(s):Red Jacket <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS Ms i. <br /> Mia. MODEL#: Mat <br /> ELLD MANUFACTURER: <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM AN a-YES ph'b.NO n1°3 <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> WILLmil FAILURFIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN' <br /> ❑ 4.INTEGRITY TESTING Mot, Meq. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ C OTHER MONTHLY EACH TIME 5 ^TBD•• Mar <br /> ❑ $.VISUAL MONITORING DONE: ❑ a.DAILY ❑u b.WEEKLY* ,aua as r❑aC.MN. afw THLEACH <br /> royST9g OPERATED" <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(aX3) <br /> ❑ 7,NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) max. <br /> ❑ 99,OTHER(Specify) 07)13/03 <br /> SJCEHD-d(07/03)-1fd <br />
The URL can be used to link to this page
Your browser does not support the video tag.