My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
2300 - Underground Storage Tank Program
>
PR0231441
>
COMPLIANCE INFO 2006-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 1:15:51 PM
Creation date
11/7/2018 5:12:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2011
RECORD_ID
PR0231441
PE
2361
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\470\PR0231441\COMPLIANCE INFO 2006-2011.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11/03/2006 10:22 FAX 1a003/003 <br /> SAN <br /> JOAQULTFCOLTNTY ENVIRONMENTAL HEALTH DIMKRTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE 2 <br /> VI.DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSERS)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) c <br /> ❑ I.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSFR CONTAINMENT(UDC) M32 <br /> PANEL MANUFACTURER: Mst. MODFLe: <br /> LEAK SENSOR MANUFACTURER: mss' MODEL R(S): <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a-YES ❑ b.NO M"' <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a-YES ❑ b.NO Mme' <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO au7. <br /> ® 2.MECHANICAL ASSEMBLY(e.g-FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: Bravo Boa Mse. MODE #(S): mm. <br /> MM1a <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY Iauyuirca aapncy uppmv+U <br /> ❑ 4.NO DISPENSERS Mal. <br /> ❑ 99.OTHER(Specify) <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENt1ANCEDLAAK ana' <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN,PER 21 CCR 62644.1,ELO IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that upply) MPU. <br /> 1. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPF.RATNU MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Acquired) <br /> 3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of l/OlIMS) <br /> 4. Q CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCTLTATIOM' <br /> 7. ❑ SWRCB PUBLICATION;"WEEKLY MANUAL TANK GAUGING 1-70R SMALL UNDERGROUND STORAGE TANKS" <br /> Met. <br /> 99.❑ OTHER(Specify): <br /> Personnel with UST monitoring responsibilities are Iamuliar with all of the above documents relevant to thcirjob duties and can access those documents when needed. <br /> By January 1,2005 this facility will have d"Designated UST Operator"who has passed the operator exam administered by the Intemational Code Council(ICC)- By <br /> January 1.2005.and annually theaeafler.the "Designated UST Operator"will vain facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> Y The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> D Whom to contact forernergencies arM leak detection alarms. <br /> For facility employees hired on or after January L 2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Plcase use this section to include any additional UST system monitoring-[glared information(c.g.,additional inforinadon required by your local agmcyY Has. <br /> The underground sntrage tanks have been pumped out. The Gilbamo EMC will continue to monitor the interstitial apace of the tanks,the fill sump and the <br /> turbine sumps, Mancea Richardson will go by the station on a daily basis to check the Gilbamo EMC for alarms. If there is on alarm she will call <br /> maimerancc and log the alarm. <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 111105, THE "DESIGNATED UST OPERATOR" IDF.NTIFTED IN SECTION RI OF THE CURRENT UST OPERATING PERMIT APPLICATION - <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVT IFS AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OP THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. M9 11 <br /> OWNRR/OPERATOR S"NATU REFRESENTINU DATE: <br /> _M`% [I owner mw. // a, D6 <br /> ❑Operator <br /> Mva. <br /> OWNER/OPERAT NAME(prin0:' L . Mme' OWNER/OPERATORTITLE: <br /> F 11196 4 f4 614 LPO <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signarurc: Date: <br /> CommcnlslSpecial Conditions: <br /> SJCEUD-d(07/03)-314 07/2y03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.