My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
890
>
2300 - Underground Storage Tank Program
>
PR0231984
>
COMPLIANCE INFO 2003 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2022 2:47:22 PM
Creation date
11/7/2018 5:37:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2006
RECORD_ID
PR0231984
PE
2361
FACILITY_ID
FA0001393
FACILITY_NAME
MANTECA LIQUOR & FOOD
STREET_NUMBER
890
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22302007
CURRENT_STATUS
01
SITE_LOCATION
890 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\890\PR0231984\COMPLIANCE INFO 2003 - 2006 .PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2006
QuestysRecordDate
2/25/2017 12:46:53 AM
QuestysRecordID
3343758
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page _of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ^ping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ her (Specify) <br /> est Method Used: , essure ❑Vacuum ❑Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run;V 2 Piping Run# 3 Piping Run # <br /> Piping Material: <br /> Piping Manufacturer: yvLQ6C,y/ Amxecc muecn <br /> Piping Diameter: S <br /> Length of Piping Run: <br /> Product Stored: 13t $Q I �5 <br /> Method and location of n <br /> piping-run isolation: ) <br /> Wait time between applying <br /> pressure/vacuum/water and �^ <br /> starting test: �✓� J h� �1 <br /> Test Start Time: s (/ <br /> Initial Reading(Ri): P3T 3V ,o S <br /> Test End Time: Y-5- ;p)C O <br /> Final Reading(RF): •;25 S j S- SZ ; 0 �sS <br /> Test Duration: 0 V.-7/A 30 ;yl � m <br /> Change in Reading(R,.-R,): J S 1 <br /> Pass/Fail Threshold or D <br /> riteria: <br /> Wrest Result: ass ❑fail ❑ Pass 0 <br /> Yail p0ass ❑Fail 1 ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ,4o U to ru- i <br />
The URL can be used to link to this page
Your browser does not support the video tag.