Laserfiche WebLink
SWRCB,January 2002 Page _of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ^ping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑ her (Specify) <br /> est Method Used: , essure ❑Vacuum ❑Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# Piping Run;V 2 Piping Run# 3 Piping Run # <br /> Piping Material: <br /> Piping Manufacturer: yvLQ6C,y/ Amxecc muecn <br /> Piping Diameter: S <br /> Length of Piping Run: <br /> Product Stored: 13t $Q I �5 <br /> Method and location of n <br /> piping-run isolation: ) <br /> Wait time between applying <br /> pressure/vacuum/water and �^ <br /> starting test: �✓� J h� �1 <br /> Test Start Time: s (/ <br /> Initial Reading(Ri): P3T 3V ,o S <br /> Test End Time: Y-5- ;p)C O <br /> Final Reading(RF): •;25 S j S- SZ ; 0 �sS <br /> Test Duration: 0 V.-7/A 30 ;yl � m <br /> Change in Reading(R,.-R,): J S 1 <br /> Pass/Fail Threshold or D <br /> riteria: <br /> Wrest Result: ass ❑fail ❑ Pass 0 <br /> Yail p0ass ❑Fail 1 ❑ Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ,4o U to ru- i <br />